HTS Heading 7114

Articles of goldsmiths' or silversmiths' wares and parts thereof, of precious metal or of metal clad with precious metal

All 11 HTS codes under heading 7114 (articles of goldsmiths'), with their duty rates from the 2026 HTS Revision 23. General duty 2.7% to 7.9%.

Every line of heading 7114

  • 7114 Articles of goldsmiths' or silversmiths' wares and parts thereof, of precious metal or of metal clad with precious metal.
  • 7114.11 Of silver, whether or not plated or clad with other precious metal.
  • 7114.11.10.00 Knives with silver handles (under: Of silver, whether or not plated or clad with other precious metal) (No.): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 16¢ each + 45%.
  • 7114.11.20.00 Forks with silver handles (under: Of silver, whether or not plated or clad with other precious metal) (No.): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 16¢ each + 45%.
  • 7114.11.30.00 With sterling silver handles (under: Spoons and ladles) (No.): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.11.40.00 Other (under: Spoons and ladles) (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.11.45.00 Sets of the foregoing which include two or more knives, forks, spoons or ladles (pcs): General 3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.11.50.00 Sterling silver tableware (under: Articles not elsewhere specified or included of a type used for household, table or kitchen use; toilet and sanitary wares; all the foregoing and parts thereof, of silver) (g): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.11.60.00 Other (under: Articles not elsewhere specified or included of a type used for household, table or kitchen use; toilet and sanitary wares; all the foregoing and parts thereof, of silver) (g): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.11.70.00 Other (under: Of silver, whether or not plated or clad with other precious metal) (g): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.19.00.00 Of other precious metal whether or not plated or clad with precious metal (g): General 7.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.20.00 Of base metal clad with precious metal: General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7114.20.00.40 Articles not elsewhere specified or included, of a type used for household, table or kitchen use; toilet or sanitary ware (g).
  • 7114.20.00.60 Other (under: Of base metal clad with precious metal) (g).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.