HTS Heading 7115
Other articles of precious metal or of metal clad with precious metal
All 7 HTS codes under heading 7115 (other articles of precious metal), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%.
Every line of heading 7115
- 7115 Other articles of precious metal or of metal clad with precious metal.
- 7115.10.00.00 Catalysts in the form of wire cloth or grill, of platinum (g): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 7115.90 Other (under: Other articles of precious metal or of metal clad with precious metal).
- 7115.90.05 Articles of precious metal, in rectangular or near rectangular shapes, containing 99.5 percent or more by weight of a precious metal and not otherwise marked or decorated than with weight, purity, or other identifying information: General Free; Special none; Column 2 Free.
- 7115.90.05.30 Of gold (under: Articles of precious metal, in rectangular or near rectangular shapes, containing 99.5 percent or more by weight of a precious metal and not otherwise marked or decorated than with weight, purity, or other identifying information) (g).
- 7115.90.05.60 Of silver (under: Articles of precious metal, in rectangular or near rectangular shapes, containing 99.5 percent or more by weight of a precious metal and not otherwise marked or decorated than with weight, purity, or other identifying information) (g).
- 7115.90.05.90 Other (under: Articles of precious metal, in rectangular or near rectangular shapes, containing 99.5 percent or more by weight of a precious metal and not otherwise marked or decorated than with weight, purity, or other identifying information) (g).
- 7115.90.30.00 Of gold, including metal clad with gold (g): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
- 7115.90.40.00 Of silver, including metal clad with silver (g): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 7115.90.60.00 Other (under: Other) (g): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.