HTS Heading 7116

Articles of natural or cultured pearls, precious or semiprecious stones (natural, synthetic or reconstructed)

All 8 HTS codes under heading 7116 (articles of natural or cultured pearls), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.5%.

Every line of heading 7116

  • 7116 Articles of natural or cultured pearls, precious or semiprecious stones (natural, synthetic or reconstructed).
  • 7116.10 Of natural or cultured pearls.
  • 7116.10.10.00 Natural (under: Of natural or cultured pearls) (g): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 7116.10.25.00 Cultured (under: Of natural or cultured pearls) (g): General 5.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
  • 7116.20 Of precious or semiprecious stones (natural, synthetic or reconstructed).
  • 7116.20.05.00 Valued not over $40 per piece (g): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 7116.20.15.00 Other (under: Articles of jewelry) (g): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 7116.20.30.00 Graded semiprecious stones strung temporarily for convenience of transport (g): General 2.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7116.20.35.00 Figurines of semiprecious stone (No.): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7116.20.40.00 Other (under: Of semiprecious stones (except rock crystal)) (No.): General 10.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 7116.20.50.00 Other (under: Other) (No.): General Free; Special none; Column 2 50%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.