HTS Heading 7117
Imitation jewelry
All 15 HTS codes under heading 7117 (imitation jewelry), with their duty rates from the 2026 HTS Revision 23. General duty Free to 11%.
Every line of heading 7117
- 7117 Imitation jewelry.
- 7117.11.00.00 Cuff links and studs (under: Of base metal, whether or not plated with precious metal) (No.): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
- 7117.19 Other (under: Of base metal, whether or not plated with precious metal).
- 7117.19.05.00 Toy jewelry valued not over 8 cents per piece (kg): General Free; Special none; Column 2 80%.
- 7117.19.15.00 Other (under: Valued not over 33 cents per meter) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 7117.19.20.00 Valued over 33 cents per meter (kg): General 11%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
- 7117.19.30.00 Religious articles of a purely devotional charac- ter designed to be worn on apparel or carried on or about or attached to the person (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7117.19.60.00 Toy jewelry valued not over 8 cents per piece (kg): General Free; Special none; Column 2 110%.
- 7117.19.90.00 Other (under: Other) (kg): General 11%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
- 7117.90 Other (under: Imitation jewelry).
- 7117.90.10.00 Necklaces, valued not over 30 cents per dozen, composed wholly of plastic shapes mounted on fiber string (doz.): General Free; Special none; Column 2 Free.
- 7117.90.20.00 Rosaries and chaplets (under: Religious articles of a purely devotional character designed to be worn on apparel or carried on or about or attached to the person) (kg): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 7117.90.30.00 Other (under: Religious articles of a purely devotional character designed to be worn on apparel or carried on or about or attached to the person) (kg): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7117.90.45.00 Toy jewelry (except parts) (under: Valued not over 20 cents per dozen pieces or parts) (kg): General Free; Special none; Column 2 45%.
- 7117.90.55.00 Other (under: Valued not over 20 cents per dozen pieces or parts) (kg): General 7.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7117.90.60.00 Toy jewelry (except parts) valued not over 8 cents per piece (kg): General Free; Special none; Column 2 110%.
- 7117.90.75.00 Of plastics (under: Other) (kg): General Free; Special none; Column 2 110%.
- 7117.90.90.00 Other (under: Other) (kg): General 11%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.