HTS Heading 7205

Granules and powders, of pig iron, spiegeleisen, iron or steel

All 3 HTS codes under heading 7205 (granules and powders, of pig iron), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7205

  • 7205 Granules and powders, of pig iron, spiegeleisen, iron or steel.
  • 7205.10.00.00 Granules (under: Granules and powders, of pig iron, spiegeleisen, iron or steel) (kg): General Free; Special none; Column 2 3%.
  • 7205.21.00.00 Of alloy steel (under: Powders) (kg): General Free; Special none; Column 2 45%.
  • 7205.29.00.00 Other (under: Powders) (t): General Free; Special none; Column 2 $2.21/t.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.