HTS Heading 7206

Iron and nonalloy steel in ingots or other primary forms (excluding iron of heading 7203)

All 2 HTS codes under heading 7206 (iron and nonalloy steel in ingots), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7206

  • 7206 Iron and nonalloy steel in ingots or other primary forms (excluding iron of heading 7203).
  • 7206.10.00.00 Ingots (under: Iron and nonalloy steel in ingots or other primary forms (excluding iron of heading 7203)) (kg): General Free; Special none; Column 2 20%.
  • 7206.90.00.00 Other (under: Iron and nonalloy steel in ingots or other primary forms (excluding iron of heading 7203)) (kg): General Free; Special none; Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.