HTS Heading 7207

Semifinished products of iron or nonalloy steel

All 9 HTS codes under heading 7207 (semifinished products of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7207

  • 7207 Semifinished products of iron or nonalloy steel.
  • 7207.11.00.00 Of rectangular (including square) cross section, the width measuring less than twice the thickness (kg): General Free; Special none; Column 2 20%.
  • 7207.12.00 Other, of rectangular (other than square) cross section: General Free; Special none; Column 2 20%.
  • 7207.12.00.10 Having a width measuring less than four times the thickness (kg).
  • 7207.12.00.50 Having a width measuring at least four times the thickness (kg).
  • 7207.19.00 Other (under: Containing by weight less than 0.25 percent of carbon): General Free; Special none; Column 2 20%.
  • 7207.19.00.30 Of circular cross section (under: Other) (kg).
  • 7207.19.00.90 Other (under: Other) (kg).
  • 7207.20.00 Containing by weight 0.25 percent or more of carbon: General Free; Special none; Column 2 20%.
  • 7207.20.00.25 Having a width measuring less than four times the thickness (kg).
  • 7207.20.00.45 Having a width measuring at least four times the thickness (kg).
  • 7207.20.00.75 Of circular cross section (under: Containing by weight 0.25 percent or more of carbon) (kg).
  • 7207.20.00.90 Other (under: Containing by weight 0.25 percent or more of carbon) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.