HTS Heading 7208
Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, hot-rolled, not clad, plated or coated
All 32 HTS codes under heading 7208 (flat-rolled products of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7208
- 7208 Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, hot-rolled, not clad, plated or coated.
- 7208.10 In coils, not further worked than hot-rolled, with patterns in relief.
- 7208.10.15.00 Pickled (under: In coils, not further worked than hot-rolled, with patterns in relief) (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
- 7208.10.30.00 Of a thickness of 4.75 mm or more (kg): General Free; Special none; Column 2 20%.
- 7208.10.60.00 Of a thickness of less than 4.75 mm (kg): General Free; Special none; Column 2 20%.
- 7208.25 Of a thickness of 4.75 mm or more.
- 7208.25.30.00 Of high-strength steel (under: Of a thickness of 4.75 mm or more) (kg): General Free; Special none; Column 2 20%.
- 7208.25.60.00 Other (under: Of a thickness of 4.75 mm or more) (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
- 7208.26.00 Of a thickness of 3 mm or more but less than 4.75 mm: General Free; Special none; Column 2 0.4¢/kg + 20%.
- 7208.26.00.30 High-strength steel (under: Of a thickness of 3 mm or more but less than 4.75 mm) (kg).
- 7208.26.00.60 Other (under: Of a thickness of 3 mm or more but less than 4.75 mm) (kg).
- 7208.27.00 Of a thickness of less than 3 mm: General Free; Special none; Column 2 0.4¢/kg + 20%.
- 7208.27.00.40 “Advanced” or “ultra” of a kind described in statistical note 4 to this chapter (kg).
- 7208.27.00.45 Other (under: High-strength steel) (kg).
- 7208.27.00.60 Other (under: Of a thickness of less than 3 mm) (kg).
- 7208.36.00 Of a thickness exceeding 10 mm: General Free; Special none; Column 2 20%.
- 7208.36.00.30 High-strength steel (under: Of a thickness exceeding 10 mm) (kg).
- 7208.36.00.60 Other (under: Of a thickness exceeding 10 mm) (kg).
- 7208.37.00 Of a thickness of 4.75 mm or more but not exceeding 10 mm: General Free; Special none; Column 2 20%.
- 7208.37.00.30 High-strength steel (under: Of a thickness of 4.75 mm or more but not exceeding 10 mm) (kg).
- 7208.37.00.60 Other (under: Of a thickness of 4.75 mm or more but not exceeding 10 mm) (kg).
- 7208.38.00 Of a thickness of 3 mm or more but less than 4.75 mm: General Free; Special none; Column 2 20%.
- 7208.38.00.15 High-strength steel (under: Of a thickness of 3 mm or more but less than 4.75 mm) (kg).
- 7208.38.00.30 With untrimmed edges (under: Other) (kg).
- 7208.38.00.90 Other (under: Other) (kg).
- 7208.39.00 Of a thickness of less than 3 mm: General Free; Special none; Column 2 20%.
- 7208.39.00.20 “Advanced” or “ultra” of a kind described in statistical note 4 to this chapter (kg).
- 7208.39.00.25 Other (under: High-strength steel) (kg).
- 7208.39.00.30 With untrimmed edges (under: Other) (kg).
- 7208.39.00.90 Other (under: Other) (kg).
- 7208.40 Not in coils, not further worked than hot-rolled, with patterns in relief.
- 7208.40.30 Of a thickness of 4.75 mm or more: General Free; Special none; Column 2 20%.
- 7208.40.30.30 Of a thickness exceeding 10 mm (kg).
- 7208.40.30.60 Other (under: Of a thickness of 4.75 mm or more) (kg).
- 7208.40.60 Of a thickness of less than 4.75 mm: General Free; Special none; Column 2 20%.
- 7208.40.60.30 Of a thickness less than 3 mm (kg).
- 7208.40.60.60 Other (under: Of a thickness of less than 4.75 mm) (kg).
- 7208.51.00 Of a thickness exceeding 10 mm: General Free; Special none; Column 2 20%.
- 7208.51.00.30 Universal mill plate (under: Of a thickness exceeding 10 mm) (kg).
- 7208.51.00.45 Of high-strength steel (under: Other) (kg).
- 7208.51.00.60 Other (under: Other) (kg).
- 7208.52.00.00 Of a thickness of 4.75 mm or more but not exceeding 10 mm (kg): General Free; Special none; Column 2 20%.
- 7208.53.00.00 Of a thickness of 3 mm or more but less than 4.75 mm (kg): General Free; Special none; Column 2 20%.
- 7208.54.00.00 Of a thickness of less than 3 mm (kg): General Free; Special none; Column 2 20%.
- 7208.90.00.00 Other (under: Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, hot-rolled, not clad, plated or coated) (kg): General Free; Special none; Column 2 20%.
From MFG Calcs data: Steel flat-rolled products
U.S. imports of steel flat-rolled products (headings 7208, 7209, 7210, 7211, 7212) came to $6.60B in 2025, with $1.58B in calculated duty: an effective duty of 23.9%, every duty included.
Effective duty in Sep 2026: 44.4%, against 41.2% in Sep 2025.
Largest sources in 2025: Canada $1.97B at 25.0% effective duty; South Korea $912M at 27.3% effective duty; Germany $769M at 17.8% effective duty; Taiwan $571M at 34.2% effective duty; Netherlands $473M at 19.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.