HTS Heading 7209

Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, cold-rolled (cold-reduced), not clad, plated or coated

All 22 HTS codes under heading 7209 (flat-rolled products of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7209

  • 7209 Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, cold-rolled (cold-reduced), not clad, plated or coated.
  • 7209.15.00.00 Of a thickness of 3 mm or more (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.16.00 Of a thickness exceeding 1 mm but less than 3 mm: General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.16.00.40 “Advanced” or “ultra” of a kind described in statistical note 4 to this chapter (kg).
  • 7209.16.00.45 Other (under: Annealed) (kg).
  • 7209.16.00.60 Other (under: Of high-strength steel) (kg).
  • 7209.16.00.70 Annealed (under: Other) (kg).
  • 7209.16.00.91 Other (under: Other) (kg).
  • 7209.17.00 Of a thickness of 0.5 mm or more but not exceeding 1 mm: General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.17.00.40 “Advanced” or “ultra” of a kind described in statistical note 4 to this chapter (kg).
  • 7209.17.00.45 Other (under: Annealed) (kg).
  • 7209.17.00.60 Other (under: Of high-strength steel) (kg).
  • 7209.17.00.70 Annealed (under: Other) (kg).
  • 7209.17.00.91 Other (under: Other) (kg).
  • 7209.18 Of a thickness of less than 0.5 mm.
  • 7209.18.15 Of high-strength steel (under: Of a thickness of less than 0.5 mm): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.18.15.30 Annealed (under: Of high-strength steel) (kg).
  • 7209.18.15.60 Other (under: Of high-strength steel) (kg).
  • 7209.18.25 Of a thickness of less than 0.361 mm (blackplate): General Free; Special none; Column 2 20%.
  • 7209.18.25.20 Annealed (under: Of a thickness of less than 0.361 mm (blackplate)) (kg).
  • 7209.18.25.85 Other (under: Of a thickness of less than 0.361 mm (blackplate)) (kg).
  • 7209.18.60 Other (under: Other): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.18.60.20 Annealed (under: Other) (kg).
  • 7209.18.60.90 Other (under: Other) (kg).
  • 7209.25.00.00 Of a thickness of 3 mm or more (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.26.00.00 Of a thickness exceeding 1 mm but less than 3 mm (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.27.00.00 Of a thickness of 0.5 mm or more but not exceeding 1 mm (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.28.00.00 Of a thickness of less than 0.5 mm (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7209.90.00.00 Other (under: Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, cold-rolled (cold-reduced), not clad, plated or coated) (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.

From MFG Calcs data: Steel flat-rolled products

U.S. imports of steel flat-rolled products (headings 7208, 7209, 7210, 7211, 7212) came to $6.60B in 2025, with $1.58B in calculated duty: an effective duty of 23.9%, every duty included.

Effective duty in Sep 2026: 44.4%, against 41.2% in Sep 2025.

Largest sources in 2025: Canada $1.97B at 25.0% effective duty; South Korea $912M at 27.3% effective duty; Germany $769M at 17.8% effective duty; Taiwan $571M at 34.2% effective duty; Netherlands $473M at 19.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.