HTS Heading 7210

Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, clad, plated or coated

All 21 HTS codes under heading 7210 (flat-rolled products of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7210

  • 7210 Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, clad, plated or coated.
  • 7210.11.00.00 Of a thickness of 0.5 mm or more (kg): General Free; Special none; Column 2 6%.
  • 7210.12.00.00 Of a thickness of less than 0.5 mm (kg): General Free; Special none; Column 2 6%.
  • 7210.20.00.00 Plated or coated with lead, including terne-plate (kg): General Free; Special none; Column 2 6%.
  • 7210.30.00 Electrolytically plated or coated with zinc: General Free; Special none; Column 2 21.5%.
  • 7210.30.00.30 Of high-strength steel (under: Electrolytically plated or coated with zinc) (kg).
  • 7210.30.00.60 Other (under: Electrolytically plated or coated with zinc) (kg).
  • 7210.41.00.00 Corrugated (under: Otherwise plated or coated with zinc) (kg): General Free; Special none; Column 2 21.5%.
  • 7210.49.00 Other (under: Otherwise plated or coated with zinc): General Free; Special none; Column 2 21.5%.
  • 7210.49.00.40 “Advanced” or “ultra” of a kind described in statistical note 4 to this chapter (kg).
  • 7210.49.00.45 Other (under: Of high-strength steel) (kg).
  • 7210.49.00.91 Of a thickness of 0.4 mm or more (kg).
  • 7210.49.00.95 Other (under: Other) (kg).
  • 7210.50.00 Plated or coated with chromium oxides or with chromium and chromium oxides: General Free; Special none; Column 2 45%.
  • 7210.50.00.20 Of a width less than 1050 mm (under: Plated or coated with chromium oxides or with chromium and chromium oxides) (kg).
  • 7210.50.00.90 Other (under: Plated or coated with chromium oxides or with chromium and chromium oxides) (kg).
  • 7210.61.00.00 Plated or coated with aluminum-zinc alloys (kg): General Free; Special none; Column 2 21.5%.
  • 7210.69.00.00 Other (under: Plated or coated with aluminum) (kg): General Free; Special none; Column 2 21.5%.
  • 7210.70 Painted, varnished or coated with plastics.
  • 7210.70.30.00 Not coated or plated with metal and not clad (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7210.70.60 Other (under: Painted, varnished or coated with plastics): General Free; Special none; Column 2 21.5%.
  • 7210.70.60.30 Electrolytically coated or plated (kg).
  • 7210.70.60.60 Other (under: Zinc coated or plated) (kg).
  • 7210.70.60.90 Other (under: Other) (kg).
  • 7210.90 Other (under: Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, clad, plated or coated).
  • 7210.90.10.00 Clad (under: Other) (kg): General Free; Special none; Column 2 30%.
  • 7210.90.60.00 Electrolytically coated or plated with base metal (kg): General Free; Special none; Column 2 45%.
  • 7210.90.90.00 Other (under: Other) (kg): General Free; Special none; Column 2 21.5%.

From MFG Calcs data: Steel flat-rolled products

U.S. imports of steel flat-rolled products (headings 7208, 7209, 7210, 7211, 7212) came to $6.60B in 2025, with $1.58B in calculated duty: an effective duty of 23.9%, every duty included.

Effective duty in Sep 2026: 44.4%, against 41.2% in Sep 2025.

Largest sources in 2025: Canada $1.97B at 25.0% effective duty; South Korea $912M at 27.3% effective duty; Germany $769M at 17.8% effective duty; Taiwan $571M at 34.2% effective duty; Netherlands $473M at 19.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.