HTS Heading 7211

Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, not clad, plated or coated

All 25 HTS codes under heading 7211 (flat-rolled products of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7211

  • 7211 Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, not clad, plated or coated.
  • 7211.13.00.00 Universal mill plate (under: Not further worked than hot-rolled) (kg): General Free; Special none; Column 2 20%.
  • 7211.14.00 Other, of a thickness of 4.75 mm or more: General Free; Special none; Column 2 20%.
  • 7211.14.00.30 Of high-strength steel (under: Other, of a thickness of 4.75 mm or more) (kg).
  • 7211.14.00.45 Not in coils (under: Other) (kg).
  • 7211.14.00.90 Other (under: Other) (kg).
  • 7211.19 Other (under: Not further worked than hot-rolled).
  • 7211.19.15.00 Of high-strength steel (under: Of a width of less than 300 mm) (kg): General Free; Special none; Column 2 25%.
  • 7211.19.20.00 Of a thickness exceeding 1.25 mm (kg): General Free; Special none; Column 2 25%.
  • 7211.19.30.00 Other (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 7211.19.45.00 Of high-strength steel (under: Other) (kg): General Free; Special none; Column 2 20%.
  • 7211.19.60.00 Pickled (under: Other) (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7211.19.75 Other (under: Other): General Free; Special none; Column 2 20%.
  • 7211.19.75.30 With untrimmed edges (under: In coils) (kg).
  • 7211.19.75.60 Other (under: In coils) (kg).
  • 7211.19.75.90 Other (under: Other) (kg).
  • 7211.23 Containing by weight less than 0.25 percent of carbon.
  • 7211.23.15.00 Of high-strength steel (under: Of a thickness exceeding 1.25 mm) (kg): General Free; Special none; Column 2 25%.
  • 7211.23.20.00 Other (under: Of a thickness exceeding 1.25 mm) (kg): General Free; Special none; Column 2 25%.
  • 7211.23.30.00 Of a thickness exceeding 0.25 mm but not exceeding 1.25 mm (kg): General Free; Special none; Column 2 25%.
  • 7211.23.45.00 Of a thickness not exceeding 0.25 mm (kg): General Free; Special none; Column 2 25%.
  • 7211.23.60 Other (under: Containing by weight less than 0.25 percent of carbon): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7211.23.60.30 Of a thickness exceeding 1.25 mm (kg).
  • 7211.23.60.60 Of a thickness exceeding 0.25 mm but not exceeding 1.25 mm (kg).
  • 7211.23.60.90 Of a thickness not exceeding 0.25 mm (kg).
  • 7211.29 Other (under: Not further worked than cold-rolled (cold-reduced)).
  • 7211.29.20 Of a thickness exceeding 0.25 mm: General Free; Special none; Column 2 25%.
  • 7211.29.20.30 Of a width less than 51 mm, in coils (kg).
  • 7211.29.20.90 Other (under: Of a thickness exceeding 0.25 mm) (kg).
  • 7211.29.45.00 Other (under: Of a width of less than 300 mm) (kg): General Free; Special none; Column 2 25%.
  • 7211.29.60 Other (under: Other): General Free; Special none; Column 2 0.4¢/kg + 20%.
  • 7211.29.60.30 Of a thickness exceeding 1.25 mm (kg).
  • 7211.29.60.80 Other (under: Other) (kg).
  • 7211.90.00.00 Other (under: Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, not clad, plated or coated) (kg): General Free; Special none; Column 2 20%.

From MFG Calcs data: Steel flat-rolled products

U.S. imports of steel flat-rolled products (headings 7208, 7209, 7210, 7211, 7212) came to $6.60B in 2025, with $1.58B in calculated duty: an effective duty of 23.9%, every duty included.

Effective duty in Sep 2026: 44.4%, against 41.2% in Sep 2025.

Largest sources in 2025: Canada $1.97B at 25.0% effective duty; South Korea $912M at 27.3% effective duty; Germany $769M at 17.8% effective duty; Taiwan $571M at 34.2% effective duty; Netherlands $473M at 19.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.