HTS Heading 7217
Wire of iron or nonalloy steel
All 48 HTS codes under heading 7217 (wire of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7217
- 7217 Wire of iron or nonalloy steel.
- 7217.10 Not plated or coated, whether or not polished.
- 7217.10.10.00 Of a thickness not exceeding 0.25 mm (kg): General Free; Special none; Column 2 25%.
- 7217.10.20.00 Of a thickness exceeding 0.25 mm but not exceeding 1.25 mm (kg): General Free; Special none; Column 2 25%.
- 7217.10.30.00 Of a thickness exceeding 1.25 mm (kg): General Free; Special none; Column 2 25%.
- 7217.10.40 With a diameter of less than 1.5 mm: General Free; Special none; Column 2 25%.
- 7217.10.40.40 In coils weighing not more than 2 kilograms (kg).
- 7217.10.40.45 Other (under: Heat treated) (kg).
- 7217.10.40.90 Other (under: With a diameter of less than 1.5 mm) (kg).
- 7217.10.50 With a diameter of 1.5 mm or more: General Free; Special none; Column 2 7%.
- 7217.10.50.30 Heat treated (under: With a diameter of 1.5 mm or more) (kg).
- 7217.10.50.90 Other (under: With a diameter of 1.5 mm or more) (kg).
- 7217.10.60.00 Other wire (under: Containing by weight less than 0.25 percent of carbon) (kg): General Free; Special none; Column 2 25%.
- 7217.10.70.00 Flat wire (under: Other) (kg): General Free; Special none; Column 2 25%.
- 7217.10.80 Round wire (under: Other): General Free; Special none; Column 2 25%.
- 7217.10.80.10 Heat treated (under: Containing by weight 0.25 percent or more but less than 0.6 percent of carbon) (kg).
- 7217.10.80.20 Other (under: Containing by weight 0.25 percent or more but less than 0.6 percent of carbon) (kg).
- 7217.10.80.25 With a diameter of less than 1.0 mm (kg).
- 7217.10.80.30 With a diameter of 1.0 mm or more but less than 1.5 mm (kg).
- 7217.10.80.45 With a diameter of 1.5 mm or more (kg).
- 7217.10.80.60 With a diameter of less than 1.0 mm (kg).
- 7217.10.80.75 With a diameter of 1.0 mm or more but less than 1.5 mm (kg).
- 7217.10.80.90 With a diameter of 1.5 mm or more (kg).
- 7217.10.90.00 Other wire (under: Other) (kg): General Free; Special none; Column 2 25%.
- 7217.20 Plated or coated with zinc (under: Wire of iron or nonalloy steel).
- 7217.20.15.00 Flat wire (under: Plated or coated with zinc) (kg): General Free; Special none; Column 2 26%.
- 7217.20.30.00 With a diameter of 1.5 mm or more and containing by weight less than 0.25 percent of carbon (kg): General Free; Special none; Column 2 7%.
- 7217.20.45 Other (under: Round wire): General Free; Special none; Column 2 25%.
- 7217.20.45.10 Containing by weight less than 0.25 percent of carbon (kg).
- 7217.20.45.20 Containing by weight 0.25 percent or more but less than 0.6 percent of carbon (kg).
- 7217.20.45.30 Containing by weight 0.6 percent or more of carbon (kg).
- 7217.20.45.40 Containing by weight less than 0.25 percent of carbon (kg).
- 7217.20.45.50 Containing by weight 0.25 percent or more but less than 0.6 percent of carbon (kg).
- 7217.20.45.60 Containing by weight 0.6 percent or more of carbon (kg).
- 7217.20.45.70 Containing by weight 0.25 percent or more but less than 0.6 percent of carbon (kg).
- 7217.20.45.80 Containing by weight 0.6 percent or more of carbon (kg).
- 7217.20.60.00 Containing by weight less than 0.25 percent of carbon (kg): General Free; Special none; Column 2 25%.
- 7217.20.75.00 Other (under: Other) (kg): General Free; Special none; Column 2 26%.
- 7217.30 Plated or coated with other base metals.
- 7217.30.15 Flat wire (under: Plated or coated with other base metals): General Free; Special none; Column 2 26%.
- 7217.30.15.30 Containing by weight 0.6 percent or more of carbon (kg).
- 7217.30.15.60 Other (under: Flat wire) (kg).
- 7217.30.30.00 With a diameter of 1.5 mm or more and containing by weight less than 0.25 percent of carbon (kg): General Free; Special none; Column 2 7%.
- 7217.30.45 Other (under: Round wire): General Free; Special none; Column 2 25%.
- 7217.30.45.04 Containing by weight less than 0.20 percent of carbon, and suitable for electric arc welding (kg).
- 7217.30.45.11 Containing by weight less than 0.25 percent of carbon (kg).
- 7217.30.45.20 Containing by weight 0.25 percent or more but less than 0.6 percent or carbon (kg).
- 7217.30.45.30 Containing by weight 0.6 percent or more of carbon (kg).
- 7217.30.45.41 Containing by weight less than 0.25 percent of carbon (kg).
- 7217.30.45.50 Containing by weight 0.25 percent or more but less than 0.6 percent of carbon (kg).
- 7217.30.45.60 Containing by weight 0.6 percent or more of carbon (kg).
- 7217.30.45.90 With a diameter of 1.5 mm or more (kg).
- 7217.30.60.00 Containing by weight less than 0.25 percent of carbon (kg): General Free; Special none; Column 2 25%.
- 7217.30.75.00 Other (under: Other) (kg): General Free; Special none; Column 2 26%.
- 7217.90 Other (under: Wire of iron or nonalloy steel).
- 7217.90.10.00 Coated with plastics (under: Other) (kg): General Free; Special none; Column 2 2%.
- 7217.90.50 Other (under: Other): General Free; Special none; Column 2 35%.
- 7217.90.50.30 Containing by weight less than 0.25 percent of carbon (kg).
- 7217.90.50.60 Containing by weight 0.25 percent or more but less than 0.6 percent of carbon (kg).
- 7217.90.50.90 Containing by weight 0.6 percent or more of carbon (kg).
From MFG Calcs data: Steel bar, rod, and wire
U.S. imports of steel bar, rod, and wire (headings 7213, 7214, 7215, 7216, 7217) came to $2.93B in 2025, with $647M in calculated duty: an effective duty of 22.1%, every duty included.
Effective duty in Sep 2026: 35.4%, against 34.8% in Sep 2025.
Largest sources in 2025: Canada $579M at 19.8% effective duty; Mexico $417M at 14.6% effective duty; South Korea $198M at 25.4% effective duty; Vietnam $198M at 17.5% effective duty; India $188M at 7.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.