HTS Heading 7218

Stainless steel in ingots or other primary forms; semi-finished products of stainless steel

All 9 HTS codes under heading 7218 (stainless steel in ingots or other primary forms), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7218

  • 7218 Stainless steel in ingots or other primary forms; semi-finished products of stainless steel.
  • 7218.10.00.00 Ingots and other primary forms (kg): General Free; Special none; Column 2 29%.
  • 7218.91.00 Of rectangular (other than square) cross-section: General Free; Special none; Column 2 29%.
  • 7218.91.00.15 Having a cross-sectional area of less than 232 cm2 (kg).
  • 7218.91.00.30 Having a cross-sectional area of 232 cm2 or more (kg).
  • 7218.91.00.60 Having a width at least four times the thickness (kg).
  • 7218.99.00 Other (under: Other): General Free; Special none; Column 2 29%.
  • 7218.99.00.15 Having a cross-sectional area of less than 232 cm2 (kg).
  • 7218.99.00.30 Having a cross-sectional area of 232 cm2 or more (kg).
  • 7218.99.00.45 Having a cross-sectional area of less than 232 cm2 (kg).
  • 7218.99.00.60 Having a cross-sectional area of 232 cm2 or more (kg).
  • 7218.99.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.