HTS Heading 7224

Other alloy steel in ingots or other primary forms; semi-finished products of other alloy steel

All 11 HTS codes under heading 7224 (other alloy steel in ingots), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7224

  • 7224 Other alloy steel in ingots or other primary forms; semi-finished products of other alloy steel.
  • 7224.10.00 Ingots and other primary forms: General Free; Special none; Column 2 28%.
  • 7224.10.00.05 Of high-nickel alloy steel (under: Ingots and other primary forms) (kg).
  • 7224.10.00.45 Of tool steel (under: Other) (kg).
  • 7224.10.00.75 Other (under: Other) (kg).
  • 7224.90.00 Other (under: Other alloy steel in ingots or other primary forms; semi-finished products of other alloy steel): General Free; Special none; Column 2 28%.
  • 7224.90.00.05 Of high-nickel alloy steel (under: Other) (kg).
  • 7224.90.00.15 Having a width less than four times the thickness (kg).
  • 7224.90.00.25 Having a width at least four times the thickness (kg).
  • 7224.90.00.35 Other (under: Of tool steel) (kg).
  • 7224.90.00.45 Having a width less than four times the thickness (kg).
  • 7224.90.00.55 Having a width at least four times the thickness (kg).
  • 7224.90.00.65 Of circular cross section (under: Other) (kg).
  • 7224.90.00.75 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.