HTS Heading 7225

Flat-rolled products of other alloy steel, of a width of 600 mm or more

All 28 HTS codes under heading 7225 (flat-rolled products of other alloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7225

  • 7225 Flat-rolled products of other alloy steel, of a width of 600 mm or more.
  • 7225.11.00.00 Grain-oriented (under: Of silicon electrical steel) (kg): General Free; Special none; Column 2 28%.
  • 7225.19.00.00 Other (under: Of silicon electrical steel) (kg): General Free; Special none; Column 2 28%.
  • 7225.30 Other, not further worked than hot-rolled, in coils.
  • 7225.30.11 Of tool steel (under: Of a thickness of 4.75 mm or more): General Free; Special none; Column 2 29%.
  • 7225.30.11.10 Of high-speed steel (under: Of tool steel) (kg).
  • 7225.30.11.80 Other (under: Of tool steel) (kg).
  • 7225.30.30 Other (under: Of a thickness of 4.75 mm or more): General Free; Special none; Column 2 28%.
  • 7225.30.30.05 Of high-nickel alloy steel (under: Other) (kg).
  • 7225.30.30.50 Other (under: Other) (kg).
  • 7225.30.51 Of tool steel (under: Of a thickness of less than 4.75 mm): General Free; Special none; Column 2 29%.
  • 7225.30.51.10 Of high-speed steel (under: Of tool steel) (kg).
  • 7225.30.51.80 Other (under: Of tool steel) (kg).
  • 7225.30.70.00 Other (under: Of a thickness of less than 4.75 mm) (kg): General Free; Special none; Column 2 28%.
  • 7225.40 Other, not further worked than hot-rolled, not in coils.
  • 7225.40.11 Of tool steel (under: Of a thickness of 4.75 mm or more): General Free; Special none; Column 2 29%.
  • 7225.40.11.10 Of high-speed steel (under: Of tool steel) (kg).
  • 7225.40.11.80 Other (under: Of tool steel) (kg).
  • 7225.40.30 Other (under: Of a thickness of 4.75 mm or more): General Free; Special none; Column 2 28%.
  • 7225.40.30.05 Of high-nickel alloy steel (under: Other) (kg).
  • 7225.40.30.50 Other (under: Other) (kg).
  • 7225.40.51 Of tool steel (under: Of a thickness of less than 4.75 mm): General Free; Special none; Column 2 29%.
  • 7225.40.51.10 Of high-speed steel (under: Of tool steel) (kg).
  • 7225.40.51.30 Of ball-bearing steel (under: Of tool steel) (kg).
  • 7225.40.51.60 Other (under: Of tool steel) (kg).
  • 7225.40.70.00 Other (under: Of a thickness of less than 4.75 mm) (kg): General Free; Special none; Column 2 28%.
  • 7225.50 Other, not further worked than cold-rolled (cold-reduced).
  • 7225.50.11 Of tool steel (under: Other, not further worked than cold-rolled (cold-reduced)): General Free; Special none; Column 2 29%.
  • 7225.50.11.10 Of high-speed steel (under: Of tool steel) (kg).
  • 7225.50.11.30 Of ball-bearing steel (under: Of tool steel) (kg).
  • 7225.50.11.60 Other (under: Of tool steel) (kg).
  • 7225.50.60.00 Of a thickness of 4.75 mm or more (kg): General Free; Special none; Column 2 28%.
  • 7225.50.70.00 Heat-resisting steel (under: Of a thickness of less than 4.75 mm) (kg): General Free; Special none; Column 2 29%.
  • 7225.50.80 Other (under: Of a thickness of less than 4.75 mm): General Free; Special none; Column 2 28%.
  • 7225.50.80.10 Of high-nickel alloy steel (under: Other) (kg).
  • 7225.50.80.80 Other (under: Other) (kg).
  • 7225.91.00.00 Electrolytically plated or coated with zinc (kg): General Free; Special none; Column 2 28%.
  • 7225.92.00.00 Otherwise plated or coated with zinc (kg): General Free; Special none; Column 2 28%.
  • 7225.99.00 Other (under: Other): General Free; Special none; Column 2 28%.
  • 7225.99.00.10 Of high-nickel alloy steel (under: Other) (kg).
  • 7225.99.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.