HTS Heading 7226
Flat-rolled products of other alloy steel, of a width of less than 600 mm
All 26 HTS codes under heading 7226 (flat-rolled products of other alloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7226
- 7226 Flat-rolled products of other alloy steel, of a width of less than 600 mm.
- 7226.11 Grain-oriented (under: Of silicon electrical steel).
- 7226.11.10.00 Of a width of 300 mm or more (under: Grain-oriented) (kg): General Free; Special none; Column 2 28%.
- 7226.11.90 Of a width of less than 300 mm: General Free; Special none; Column 2 33%.
- 7226.11.90.30 Of thickness not exceeding 0.25 mm (kg).
- 7226.11.90.60 Other (under: Of a width of less than 300 mm) (kg).
- 7226.19 Other (under: Of silicon electrical steel).
- 7226.19.10.00 Of a width of 300 mm or more (under: Other) (kg): General Free; Special none; Column 2 28%.
- 7226.19.90.00 Of a width of less than 300 mm (kg): General Free; Special none; Column 2 33%.
- 7226.20.00.00 Of high-speed steel (under: Flat-rolled products of other alloy steel, of a width of less than 600 mm) (kg): General Free; Special none; Column 2 37%.
- 7226.91 Not further worked than hot-rolled.
- 7226.91.05.00 Of chipper knife steel (under: Of tool steel (other than high-speed steel)) (kg): General Free; Special none; Column 2 34%.
- 7226.91.15 Of a width of 300 mm or more (under: Other): General Free; Special none; Column 2 29%.
- 7226.91.15.30 Of ball-bearing steel (under: Of a width of 300 mm or more) (kg).
- 7226.91.15.60 Other (under: Of a width of 300 mm or more) (kg).
- 7226.91.25 Of a width of less than 300 mm: General Free; Special none; Column 2 34%.
- 7226.91.25.30 Of ball-bearing steel (under: Of a width of less than 300 mm) (kg).
- 7226.91.25.60 Other (under: Of a width of less than 300 mm) (kg).
- 7226.91.50.00 Of a thickness of 4.75 mm or more (kg): General Free; Special none; Column 2 28%.
- 7226.91.70.00 Of a width of 300 mm or more (under: Of a thickness of less than 4.75 mm) (kg): General Free; Special none; Column 2 28%.
- 7226.91.80.00 Of a width of less than 300 mm (kg): General Free; Special none; Column 2 33%.
- 7226.92 Not further worked than cold-rolled (cold-reduced).
- 7226.92.10 Of a width of 300 mm or more (under: Of tool steel (other than high-speed steel)): General Free; Special none; Column 2 0.4¢/kg + 29%.
- 7226.92.10.30 Of ball-bearing steel (under: Of a width of 300 mm or more) (kg).
- 7226.92.10.60 Other (under: Of a width of 300 mm or more) (kg).
- 7226.92.30 Of a width of less than 300 mm: General Free; Special none; Column 2 34%.
- 7226.92.30.30 Of ball-bearing steel (under: Of a width of less than 300 mm) (kg).
- 7226.92.30.60 Other (under: Of a width of less than 300 mm) (kg).
- 7226.92.50.00 Of a width of 300 mm or more (under: Other) (kg): General Free; Special none; Column 2 0.4¢/kg + 28%.
- 7226.92.70 Of a thickness not exceeding 0.25 mm: General Free; Special none; Column 2 33%.
- 7226.92.70.05 Of high-nickel alloy steel (under: Of a thickness not exceeding 0.25 mm) (kg).
- 7226.92.70.50 Other (under: Of a thickness not exceeding 0.25 mm) (kg).
- 7226.92.80 Of a thickness exceeding 0.25 mm: General Free; Special none; Column 2 33%.
- 7226.92.80.05 Of high-nickel alloy steel (under: Of a thickness exceeding 0.25 mm) (kg).
- 7226.92.80.50 Other (under: Of a thickness exceeding 0.25 mm) (kg).
- 7226.99.01 Other (under: Other): General Free; Special none; Column 2 33%.
- 7226.99.01.10 Electrolytically plated or coated with zinc (kg).
- 7226.99.01.30 Otherwise plated or coated with zinc (kg).
- 7226.99.01.80 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.