HTS Heading 7227

Bars and rods, hot-rolled, in irregularly wound coils, of other alloy steel

All 14 HTS codes under heading 7227 (bars and rods, hot-rolled), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7227

  • 7227 Bars and rods, hot-rolled, in irregularly wound coils, of other alloy steel.
  • 7227.10.00.00 Of high-speed steel (under: Bars and rods, hot-rolled, in irregularly wound coils, of other alloy steel) (kg): General Free; Special none; Column 2 14%.
  • 7227.20.00 Of silico-manganese steel (under: Bars and rods, hot-rolled, in irregularly wound coils, of other alloy steel): General Free; Special none; Column 2 10%.
  • 7227.20.00.30 Of welding quality wire rods of a kind described in statistical note 7 to this chapter (kg).
  • 7227.20.00.80 Other (under: Of silico-manganese steel) (kg).
  • 7227.90 Other (under: Bars and rods, hot-rolled, in irregularly wound coils, of other alloy steel).
  • 7227.90.10 Not tempered, not treated, and not partly manufactured: General Free; Special none; Column 2 12%.
  • 7227.90.10.30 Of ball-bearing steel (under: Not tempered, not treated, and not partly manufactured) (kg).
  • 7227.90.10.60 Other (under: Not tempered, not treated, and not partly manufactured) (kg).
  • 7227.90.20 Other (under: Of tool steel (other than high-speed steel)): General Free; Special none; Column 2 11%.
  • 7227.90.20.30 Of ball-bearing steel (under: Other) (kg).
  • 7227.90.20.60 Other (under: Other) (kg).
  • 7227.90.60 Other (under: Other): General Free; Special none; Column 2 10%.
  • 7227.90.60.05 Of high-nickel alloy steel (under: Other) (kg).
  • 7227.90.60.10 Of Cold Heading Quality (CHQ) steel of a kind described in statistical note 6 to this chapter (kg).
  • 7227.90.60.20 Of welding quality wire rods of a kind described in statistical note 7 to this chapter (kg).
  • 7227.90.60.30 With a diameter of less than 14 mm (kg).
  • 7227.90.60.35 With a diameter of 14 mm or more but less than 19 mm (kg).
  • 7227.90.60.40 With a diameter of 19 mm or more (kg).
  • 7227.90.60.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.