HTS Heading 7228
Other bars and rods of other alloy steel; angles, shapes and sections, of other alloy steel; hollow drill bars and rods, of alloy or nonalloy steel
All 35 HTS codes under heading 7228 (other bars and rods of other alloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7228
- 7228 Other bars and rods of other alloy steel; angles, shapes and sections, of other alloy steel; hollow drill bars and rods, of alloy or nonalloy steel.
- 7228.10.00 Bars and rods, of high-speed steel: General Free; Special none; Column 2 32%.
- 7228.10.00.10 Not cold-formed (under: Bars and rods, of high-speed steel) (kg).
- 7228.10.00.30 With a maximum cross-sectional dimension of less than 18 mm (kg).
- 7228.10.00.60 With a maximum cross-sectional dimension of 18 mm or more (kg).
- 7228.20 Bars and rods, of silico-manganese steel.
- 7228.20.10.00 Not cold-formed (under: Bars and rods, of silico-manganese steel) (kg): General Free; Special none; Column 2 28%.
- 7228.20.50.00 Cold-formed (under: Bars and rods, of silico-manganese steel) (kg): General Free; Special none; Column 2 28%.
- 7228.30 Of tool steel (other than high-speed steel).
- 7228.30.20.00 Of ball-bearing steel (under: Of tool steel (other than high-speed steel)) (kg): General Free; Special none; Column 2 29%.
- 7228.30.40.00 Of chipper knife steel, not cold-formed (kg): General Free; Special none; Column 2 28%.
- 7228.30.60.00 Other (under: Of tool steel (other than high-speed steel)) (kg): General Free; Special none; Column 2 29%.
- 7228.30.80 Other (under: Other bars and rods, not further worked than hot-rolled, hot-drawn or extruded): General Free; Special none; Column 2 28%.
- 7228.30.80.05 Of high-nickel alloy steel (under: Other) (kg).
- 7228.30.80.10 Concrete reinforcing bars and rods (kg).
- 7228.30.80.15 With a diameter or cross section measuring less than 76 mm (kg).
- 7228.30.80.41 With a diameter or cross section measuring 76 mm or more but not exceeding 152 mm (kg).
- 7228.30.80.45 With a diameter or cross section measuring 152 mm or more but not exceeding 228 mm (kg).
- 7228.30.80.70 With a diameter or cross section exceeding 228 mm (kg).
- 7228.40.00.00 Other bars and rods, not further worked than forged (kg): General Free; Special none; Column 2 28%.
- 7228.50 Other bars and rods, not further worked than cold-formed or cold-finished.
- 7228.50.10 Of tool steel (other than high-speed steel): General Free; Special none; Column 2 29%.
- 7228.50.10.10 Of ball-bearing steel (under: Of tool steel (other than high-speed steel)) (kg).
- 7228.50.10.20 Of round or rectangular cross section with surfaces ground, milled or polished (kg).
- 7228.50.10.40 Other (under: With a maximum cross-sectional dimension of less than 18 mm) (kg).
- 7228.50.10.60 Of round or rectangular cross section with surfaces ground, milled or polished (kg).
- 7228.50.10.80 Other (under: With a maximum cross-sectional dimension of 18 mm or more) (kg).
- 7228.50.50 Other (under: Other bars and rods, not further worked than cold-formed or cold-finished): General Free; Special none; Column 2 28%.
- 7228.50.50.05 Of high-nickel alloy steel (under: Other) (kg).
- 7228.50.50.15 With a diameter or cross section measuring less than 76 mm (kg).
- 7228.50.50.40 With a diameter or cross section measuring 76 mm or more but not exceeding 228 mm (kg).
- 7228.50.50.70 With a diameter or cross section exceeding 228 mm (kg).
- 7228.60 Other bars and rods (under: Other bars and rods of other alloy steel; angles, shapes and sections, of other alloy steel; hollow drill bars and rods, of alloy or nonalloy steel).
- 7228.60.10 Of tool steel (other than high-speed steel): General Free; Special none; Column 2 29%.
- 7228.60.10.30 Of ball-bearing steel (under: Of tool steel (other than high-speed steel)) (kg).
- 7228.60.10.60 Other (under: Of tool steel (other than high-speed steel)) (kg).
- 7228.60.60.00 Not cold-formed (under: Other) (kg): General Free; Special none; Column 2 28%.
- 7228.60.80.00 Cold-formed (under: Other) (kg): General Free; Special none; Column 2 28%.
- 7228.70 Angles, shapes and sections (under: Other bars and rods of other alloy steel; angles, shapes and sections, of other alloy steel; hollow drill bars and rods, of alloy or nonalloy steel).
- 7228.70.30 Hot-rolled, not drilled, not punched and not otherwise advanced: General Free; Special none; Column 2 10%.
- 7228.70.30.10 U, I, H and T sections (under: Hot-rolled, not drilled, not punched and not otherwise advanced) (kg).
- 7228.70.30.20 Angles (under: With a maximum cross-sectional dimension of 76 mm or more) (kg).
- 7228.70.30.41 Other (under: With a maximum cross-sectional dimension of 76 mm or more) (kg).
- 7228.70.30.60 Angles (under: With a maximum cross-sectional dimension of less than 76 mm) (kg).
- 7228.70.30.81 Other (under: With a maximum cross-sectional dimension of less than 76 mm) (kg).
- 7228.70.60.00 Other (under: Angles, shapes and sections) (kg): General Free; Special none; Column 2 28%.
- 7228.80.00.00 Hollow drill bars and rods (under: Other bars and rods of other alloy steel; angles, shapes and sections, of other alloy steel; hollow drill bars and rods, of alloy or nonalloy steel) (kg): General Free; Special none; Column 2 30%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.