HTS Heading 7309
Reservoirs, tanks, vats and similar containers for any material (other than compressed or liquefied gas), of iron or steel, of a capacity exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment
All 2 HTS codes under heading 7309 (reservoirs, tanks), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7309
- 7309.00.00 Reservoirs, tanks, vats and similar containers for any material (other than compressed or liquefied gas), of iron or steel, of a capacity exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment: General Free; Special none; Column 2 45%.
- 7309.00.00.30 Tanks (under: Reservoirs, tanks, vats and similar containers for any material (other than compressed or liquefied gas), of iron or steel, of a capacity exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment) (No., kg).
- 7309.00.00.90 Other (under: Reservoirs, tanks, vats and similar containers for any material (other than compressed or liquefied gas), of iron or steel, of a capacity exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment) (No., kg).
From MFG Calcs data: Tanks, vessels, and gas cylinders
U.S. imports of tanks, vessels, and gas cylinders (headings 7309, 7310, 7311) came to $1.34B in 2025, with $301M in calculated duty: an effective duty of 22.4%, every duty included.
Effective duty in Sep 2026: 42.8%, against 33.3% in Sep 2025.
Largest sources in 2025: Mexico $267M at 10.0% effective duty; China $181M at 59.2% effective duty; Canada $177M at 9.6% effective duty; India $106M at 23.8% effective duty; South Korea $92.1M at 13.1% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.