HTS Heading 7310
Tanks, casks, drums, cans, boxes and similar containers, for any material (other than compressed or liquefied gas), of iron or steel, of a capacity not exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment
All 10 HTS codes under heading 7310 (tanks, casks, drums, cans), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7310
- 7310 Tanks, casks, drums, cans, boxes and similar containers, for any material (other than compressed or liquefied gas), of iron or steel, of a capacity not exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment.
- 7310.10.00 Of a capacity of 50 liters or more: General Free; Special none; Column 2 25%.
- 7310.10.00.05 Refillable stainless steel kegs, whether or not pressurized, of a kind described in statistical note 1 to this chapter. (No.).
- 7310.10.00.15 Empty steel drums and barrels (No., kg).
- 7310.10.00.90 Other (under: Of a capacity of 50 liters or more) (kg).
- 7310.21.00 Cans which are to be closed by soldering or crimping: General Free; Special none; Column 2 25%.
- 7310.21.00.25 Containers, of circular cross section, of a volume capacity between 11.4 liters and 26.6 liters, of a kind used for the conveyance of goods (No.).
- 7310.21.00.70 Containers of a circular cross section, of a capacity not exceeding 11.4 liters, of a kind used for aerosols (No.).
- 7310.21.00.75 Other (under: Cans which are to be closed by soldering or crimping) (No.).
- 7310.29.00 Other (under: Of a capacity of less than 50 liters): General Free; Special none; Column 2 25%.
- 7310.29.00.20 Refillable stainless steel kegs, whether or not pressurized, of a kind described in statistical note 1 to this chapter (No.).
- 7310.29.00.30 Other (under: Containers, of circular cross section, of a volume capacity between 11.4 liters and 26.6 liters, of a kind used for the conveyance of goods) (No.).
- 7310.29.00.55 Refillable stainless steel kegs, whether or not pressurized, of a kind described in statistical note 1 to this chapter (No.).
- 7310.29.00.65 Other (under: Other) (No.).
From MFG Calcs data: Tanks, vessels, and gas cylinders
U.S. imports of tanks, vessels, and gas cylinders (headings 7309, 7310, 7311) came to $1.34B in 2025, with $301M in calculated duty: an effective duty of 22.4%, every duty included.
Effective duty in Sep 2026: 42.8%, against 33.3% in Sep 2025.
Largest sources in 2025: Mexico $267M at 10.0% effective duty; China $181M at 59.2% effective duty; Canada $177M at 9.6% effective duty; India $106M at 23.8% effective duty; South Korea $92.1M at 13.1% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.