Sourcing Signal
Tanks, vessels, and gas cylinders: Import Burden by Source Country
Compare observed duty-and-freight burdens for source countries supplying tanks, vessels, and gas cylinders, from USITC DataWeb. Dollar landed-cost rankings appear only when at least two lanes have complete country-specific customs unit values.
How to read this
- Duty and international freight are additive shares of customs value: uplift = 1 + duty + freight. Missing components stay unknown; duty is not compounded onto freight.
- No comparative dollar ranking is shown unless at least two lanes have their own customs unit value, duty, and freight inputs. Complete burdens may still be compared without calling the lowest one a cheapest supplier.
- The FX tag is a short-window cost direction from the currency's recent drift, not a dollar recompute.
Source-country duty-and-freight burdens (unranked)
- null. Canada: 11.72% loaded (duty 9.62%, freight 2.1%), CAD trending flat
- null. Mexico: 12.17% loaded (duty 10.03%, freight 2.14%), MXN trending cheaper
- null. South Korea: 15.13% loaded (duty 13.14%, freight 1.99%)
- null. Spain: 17.74% loaded (duty 14.26%, freight 3.48%), EUR trending cheaper
- null. Italy: 18.94% loaded (duty 12.81%, freight 6.13%), EUR trending cheaper
- null. Thailand: 24.93% loaded (duty 20.83%, freight 4.1%)
- null. Germany: 30.92% loaded (duty 25.97%, freight 4.95%), EUR trending cheaper
- null. Taiwan: 34.01% loaded (duty 29.71%, freight 4.3%)
- null. India: 38.67% loaded (duty 23.82%, freight 14.85%)
- null. China: 71.29% loaded (duty 59.2%, freight 12.09%), CNY trending flat
Sourcing concentration
- Mexico is the largest retained source at 20% of total family import customs value. Retained sources cover 83.8%; their named-source HHI floor is 970, which falls in the diversified range without classifying the omitted-source tail.
Frequently asked questions
- Why is there no dollar landed cost for tanks, vessels, and gas cylinders? No complete country-specific customs unit value is available for this family in the committed snapshot. The page compares observed duty-and-freight burdens but does not rank lanes until at least two have reported quantity, duty, and freight data.
- How concentrated is sourcing of tanks, vessels, and gas cylinders? Mexico is the largest retained source at 20% of total family import customs value. Retained sources cover 83.8% of family import customs value, so the named-source Herfindahl index of 970 is a lower bound; its floor falls in the diversified band but does not classify the omitted-source tail. A concentrated map means fewer places to move volume if one lane's duty jumps.
About this data
- A sourcing-comparison indicator, not a customs quote. Duty and international freight are added over customs value; duty is not compounded onto freight. Lanes are ranked by modeled landed customs unit value only when at least two have their own reported customs unit value, duty, and freight. Missing or suppressed quantity data remains unknown. FX is a direction, not a recompute. Confirm classification and entry costs with a licensed broker.
Last reviewed 2026-10-08.