HTS Heading 7408
Copper wire
All 9 HTS codes under heading 7408 (copper wire), with their duty rates from the 2026 HTS Revision 23. General duty 1% to 3%.
Every line of heading 7408
- 7408 Copper wire.
- 7408.11 Of which the maximum cross-sectional dimension exceeds 6 mm.
- 7408.11.30.00 With a maximum cross-sectional dimension over 9.5 mm (kg): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7%.
- 7408.11.60.00 With a maximum cross-sectional dimension over 6 mm but not over 9.5 mm (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28%.
- 7408.19.00 Other (under: Of refined copper): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28%.
- 7408.19.00.30 With a maximum cross-sectional dimension of 3 mm or less (kg).
- 7408.19.00.60 Other (under: Other) (kg).
- 7408.21.00.00 Of copper-zinc base alloys (brass) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28%.
- 7408.22 Of copper-nickel base alloys (cupro-nickel) or copper-nickel-zinc base alloys (nickel silver).
- 7408.22.10.00 Coated or plated with metal (under: Of copper-nickel base alloys (cupro-nickel) or copper-nickel-zinc base alloys (nickel silver)) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28%.
- 7408.22.50.00 Not coated or plated with metal (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28%.
- 7408.29 Other (under: Of copper alloys).
- 7408.29.10.00 Coated or plated with metal (under: Other) (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28%.
- 7408.29.50.00 Not coated or plated with metal (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28%.
From MFG Calcs data: Copper semi-finished products
U.S. imports of copper semi-finished products (headings 7407, 7408, 7409, 7410, 7411) came to $5.36B in 2025, with $580M in calculated duty: an effective duty of 10.8%, every duty included.
Effective duty in Sep 2026: 41.3%, against 42.3% in Sep 2025.
Largest sources in 2025: Canada $1.38B at 2.6% effective duty; Germany $632M at 13.9% effective duty; South Korea $454M at 14.1% effective duty; Peru $418M at 12.7% effective duty; Mexico $327M at 9.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.