HTS Heading 7409

Copper plates, sheets and strip, of a thickness exceeding 0.15 mm

All 29 HTS codes under heading 7409 (copper plates, sheets and strip), with their duty rates from the 2026 HTS Revision 23. General duty 1% to 3%.

Every line of heading 7409

  • 7409 Copper plates, sheets and strip, of a thickness exceeding 0.15 mm.
  • 7409.11 In coils (under: Of refined copper).
  • 7409.11.10.00 Of a thickness of 5 mm or more (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 38%.
  • 7409.11.50 Of a thickness of less than 5 mm: General 1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.5%.
  • 7409.11.50.10 Of a width of 500 mm or more (under: Of a thickness of less than 5 mm) (kg).
  • 7409.11.50.50 Of a width of less than 500 mm (kg).
  • 7409.19 Other (under: Of refined copper).
  • 7409.19.10.00 Of a thickness of 5 mm or more (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7409.19.50.00 Of a width of 500 mm or more (under: Of a thickness of less than 5 mm) (kg): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.5%.
  • 7409.19.90.00 Of a width of less than 500 mm (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7409.21.00 In coils (under: Of copper-zinc base alloys (brass)): General 1.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7409.21.00.10 Of a thickness of 5 mm or more (kg).
  • 7409.21.00.50 Of a width of 500 mm or more (under: Of a thickness of less than 5 mm) (kg).
  • 7409.21.00.75 Of a thickness less than 1.6 mm (kg).
  • 7409.21.00.90 Other (under: Of a width of less than 500 mm) (kg).
  • 7409.29.00 Other (under: Of copper-zinc base alloys (brass)): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7409.29.00.10 Of a thickness of 5 mm or more (kg).
  • 7409.29.00.50 Of a width of 500 mm or more (under: Of a thickness of less than 5 mm) (kg).
  • 7409.29.00.75 Of a thickness less than 1.6 mm (kg).
  • 7409.29.00.90 Other (under: Of a width of less than 500 mm) (kg).
  • 7409.31 In coils (under: Of copper-tin base alloys (bronze)).
  • 7409.31.10.00 Of a thickness of 5 mm or more (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
  • 7409.31.50.00 Of a width of 500 mm or more (under: Of a thickness of less than 5 mm) (kg): General 1.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7409.31.90.00 Of a width of less than 500 mm (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
  • 7409.39 Other (under: Of copper-tin base alloys (bronze)).
  • 7409.39.10 Of a thickness of 5 mm or more: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
  • 7409.39.10.30 Of phosphor bronze (under: Of a thickness of 5 mm or more) (kg, Cu kg).
  • 7409.39.10.60 Other (under: Of a thickness of 5 mm or more) (kg, Cu kg).
  • 7409.39.50.00 Of a width of 500 mm or more (under: Of a thickness of less than 5 mm) (kg): General 1.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7409.39.90 Of a width of less than 500 mm: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
  • 7409.39.90.30 Of phosphor bronze (under: Of a width of less than 500 mm) (kg, Cu kg).
  • 7409.39.90.60 Other (under: Of a width of less than 500 mm) (kg, Cu kg).
  • 7409.40.00.00 Of copper-nickel base alloys (cupro-nickel) or copper- nickel-zinc base alloys (nickel silver) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7409.90 Of other copper alloys (under: Copper plates, sheets and strip, of a thickness exceeding 0.15 mm).
  • 7409.90.10 Of a thickness of 5 mm or more: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
  • 7409.90.10.30 Of beryllium copper (under: Of a thickness of 5 mm or more) (kg, Cu kg).
  • 7409.90.10.60 Other (under: Of a thickness of 5 mm or more) (kg, Cu kg).
  • 7409.90.50 Of a width of 500 mm or more (under: Of a thickness of less than 5 mm): General 1.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7409.90.50.30 Of beryllium copper (under: Of a width of 500 mm or more) (kg, Cu kg).
  • 7409.90.50.60 Other (under: Of a width of 500 mm or more) (kg, Cu kg).
  • 7409.90.90 Of a width of less than 500 mm: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
  • 7409.90.90.30 Of beryllium copper (under: Of a width of less than 500 mm) (kg, Cu kg).
  • 7409.90.90.60 Other (under: Of a width of less than 500 mm) (kg, Cu kg).

From MFG Calcs data: Copper semi-finished products

U.S. imports of copper semi-finished products (headings 7407, 7408, 7409, 7410, 7411) came to $5.36B in 2025, with $580M in calculated duty: an effective duty of 10.8%, every duty included.

Effective duty in Sep 2026: 41.3%, against 42.3% in Sep 2025.

Largest sources in 2025: Canada $1.38B at 2.6% effective duty; Germany $632M at 13.9% effective duty; South Korea $454M at 14.1% effective duty; Peru $418M at 12.7% effective duty; Mexico $327M at 9.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.