HTS Heading 7410

Copper foil (whether or not printed or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0.15 mm

All 8 HTS codes under heading 7410 (copper foil), with their duty rates from the 2026 HTS Revision 23. General duty 1% to 3%.

Every line of heading 7410

  • 7410 Copper foil (whether or not printed or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0.15 mm.
  • 7410.11.00.00 Of refined copper (under: Not backed) (kg): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.5%.
  • 7410.12.00 Of copper alloys (under: Not backed): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 6.5%.
  • 7410.12.00.30 Of copper-zinc base alloys (brass) (kg).
  • 7410.12.00.60 Other (under: Of copper alloys) (kg).
  • 7410.21 Of refined copper (under: Backed).
  • 7410.21.30 Copper clad laminates (under: Of refined copper): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 7410.21.30.20 Having copper on one side only (m2, kg).
  • 7410.21.30.40 Having copper on both sides (under: Having a base wholly of plastics impregnated glass) (m2, kg).
  • 7410.21.30.60 Other (under: Copper clad laminates) (m2, kg).
  • 7410.21.60.00 Other (under: Of refined copper) (kg): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 6%.
  • 7410.22.00.00 Of copper alloys (under: Backed) (kg): General 1.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 6%.

From MFG Calcs data: Copper semi-finished products

U.S. imports of copper semi-finished products (headings 7407, 7408, 7409, 7410, 7411) came to $5.36B in 2025, with $580M in calculated duty: an effective duty of 10.8%, every duty included.

Effective duty in Sep 2026: 41.3%, against 42.3% in Sep 2025.

Largest sources in 2025: Canada $1.38B at 2.6% effective duty; Germany $632M at 13.9% effective duty; South Korea $454M at 14.1% effective duty; Peru $418M at 12.7% effective duty; Mexico $327M at 9.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.