Tariff monitor · Machinery & Equipment

Industrial Furnaces and Ovens: Statutory & Effective Tariff Rates

USITC Column 1 General rates for 18 industrial furnaces and ovens HTS lines (parseable range 0%–4.2%).

The short answer

  • The observed effective calculated-duty rate on U.S. imports of industrial furnaces and ovens was 7.69% in Aug 2026, down from 18.78% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0%–4.2% across 18 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Germany is the largest source, holding 17.1% of 2025 imports.

Statutory rates from the schedule

  • Gas and electric furnaces, ovens, and induction heating — melting, heat-treating, curing, and drying at temperature. This family covers HTS headings 8417, 8514: 18 eight-digit rate lines with a parseable Column 1 General range of 0%–4.2% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.

Observed calculated-duty data

  • Latest month on record (2026-08): 7.69% effective on $115.0M of imports, versus 18.78% in the same month a year earlier. The monthly archive holds 44 observations from 2023-01 through 2026-08.
  • In 2025, U.S. imports for consumption in this family totaled $1.3B in customs value, with $129.3M in USITC reported calculated duty on $1.3B of covered customs value: an effective calculated-duty rate of 9.65%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
  • A year earlier the effective calculated-duty rate was 2.46%, so the observed rate rose 7.2 points.
  • Top source countries in 2025: Germany ($228.7M at 6.52%), China ($171.1M at 29.54%), Japan ($133.9M at 4.08%), Italy ($121.3M at 7.82%), Canada ($108.1M at 1.4%).
  • Reported freight and insurance equaled 3.01% of covered customs value in 2025 ($40.3M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.
  • For scale, 2025 imports in this family equal 0.3% of the U.S. machinery industry's $457B gross output (2025, BEA).

Representative rate lines

  • 8417.10.00.00: Furnaces and ovens for the roasting, melting or other heat treatment of ores, pyrites or o · MFN 2.9%
  • 8417.20.00.00: Bakery ovens, including biscuit ovens · MFN 3.5%
  • 8417.80.00.00: Other, except parts · MFN 3.9%
  • 8417.90.00.00: Parts · MFN 3.9%
  • 8514.11.00.00: Hot isostatic presses · MFN Free
  • 8514.19.00.00: Other · MFN Free
  • 8514.20.40.00: For making hot drinks, or for cooking or heating food · MFN 4%
  • 8514.20.60.00: Other · MFN 4.2%

Frequently asked questions

  • What is the U.S. tariff rate on industrial furnaces and ovens? USITC calculated duties imply an effective rate of 7.69% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%–4.2%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
  • What are the statutory MFN line rates for industrial furnaces and ovens? The parseable Column 1 General line-rate range is 0%–4.2% across the family's 18 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 8417, 8514). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
  • Which countries supply the most industrial furnaces and ovens to the U.S.? Top retained sources in 2025: Germany ($228.7M at 6.52%), China ($171.1M at 29.54%), Japan ($133.9M at 4.08%). Germany holds 17.1% of total family import customs value. Retained sources cover 76.5%; their HHI is 780, a lower bound whose floor falls in the diversified range without classifying the omitted tail.
  • How much industrial furnaces and ovens does the U.S. import? $1.3B of customs value in 2025, with $129.3M in USITC Calculated Duties — an effective calculated-duty rate of 9.65%.
  • Is the U.S. a net importer of industrial furnaces and ovens? Yes — a net importer in 2025: $1.3B imported vs $860.4M exported (exports are 64% of imports).

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-08.