Tariff monitor · Machinery & Equipment
Semiconductor and Display Equipment: Statutory & Effective Tariff Rates
USITC Column 1 General rates for 5 semiconductor and display equipment HTS lines (parseable range 0%).
The short answer
- The observed effective calculated-duty rate on U.S. imports of semiconductor and display equipment was 0.61% in Aug 2026, down from 3.88% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0% across 5 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Japan is the largest source, holding 24.4% of 2025 imports.
Statutory rates from the schedule
- Machines for making wafers, chips, and flat-panel displays — the fab and back-end tooling behind electronics. This family covers HTS heading 8486: 5 eight-digit rate lines with a parseable Column 1 General range of 0% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.
Observed calculated-duty data
- Latest month on record (2026-08): 0.61% effective on $2.2B of imports, versus 3.88% in the same month a year earlier. The monthly archive holds 152 observations from 2014-01 through 2026-08.
- In 2025, U.S. imports for consumption in this family totaled $12.2B in customs value, with $508.0M in USITC reported calculated duty on $12.2B of covered customs value: an effective calculated-duty rate of 4.16%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
- A year earlier the effective calculated-duty rate was 1.4%, so the observed rate rose 2.8 points.
- Top source countries in 2025: Japan ($3.0B at 2.53%), Netherlands ($2.7B at 1.39%), Singapore ($1.4B at 0.97%), Malaysia ($955.7M at 1.89%), Germany ($946.5M at 2.65%).
- Reported freight and insurance equaled 2.14% of covered customs value in 2025 ($261.9M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.
- Customs unit value: 1499.7352 per unit in 2025, aggregate declared customs value divided by reported quantity across eligible single-unit lines (USITC DataWeb); not a transaction price.
- For scale, 2025 imports in this family equal 2.7% of the U.S. computer and electronic products industry's $447B gross output (2025, BEA).
Representative rate lines
- 8486.10.00.00: Machines and apparatus for the manufacture of boules or wafers · MFN Free
- 8486.20.00.00: Machines and apparatus for the manufacture of semiconductor devices or of electronic integ · MFN Free
- 8486.30.00.00: Machines and apparatus for the manufacture of flat panel displays · MFN Free
- 8486.40.00: Machines and apparatus specified in note 11(C) to this chapter · MFN Free
- 8486.90.00.00: Parts and accessories · MFN Free
Frequently asked questions
- What is the U.S. tariff rate on semiconductor and display equipment? USITC calculated duties imply an effective rate of 0.61% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
- What are the statutory MFN line rates for semiconductor and display equipment? The parseable Column 1 General line-rate range is 0% across the family's 5 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 8486). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
- Which countries supply the most semiconductor and display equipment to the U.S.? Top retained sources in 2025: Japan ($3.0B at 2.53%), Netherlands ($2.7B at 1.39%), Singapore ($1.4B at 0.97%). Japan holds 24.4% of total family import customs value. Retained sources cover 93%; their HHI is 1430, a lower bound whose floor falls in the diversified range without classifying the omitted tail.
- How much semiconductor and display equipment does the U.S. import? $12.2B of customs value in 2025, with $508.0M in USITC Calculated Duties — an effective calculated-duty rate of 4.16%.
- Is the U.S. a net importer of semiconductor and display equipment? No — a net exporter in 2025: $12.2B imported vs $17.4B exported.
- What is the customs unit value of semiconductor and display equipment? $1,500/unit in 2025, derived as customs value ÷ reported quantity from USITC DataWeb. It is an aggregate across the family's product and origin mix, not a transaction price or supplier quote.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-08.