HTS Heading 8703

Motor cars and other motor vehicles principally designed for the transport of persons (other than those of heading 8702), including station wagons and racing cars

All 73 HTS codes under heading 8703 (motor cars), with their duty rates from the 2026 HTS Revision 23. General duty 2.5%.

Every line of heading 8703

  • 8703 Motor cars and other motor vehicles principally designed for the transport of persons (other than those of heading 8702), including station wagons and racing cars.
  • 8703.10 Vehicles specially designed for traveling on snow; golf carts and similar vehicles.
  • 8703.10.10.00 Vehicles specially designed for traveling on snow (No.): General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.10.50 Other (under: Vehicles specially designed for traveling on snow; golf carts and similar vehicles): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.10.50.30 Golf carts (under: Other) (No.).
  • 8703.10.50.60 Other (under: Other) (No.).
  • 8703.21.01 Of a cylinder capacity not exceeding 1,000 cc: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.21.01.10 With label indicating that vehicle is for operation only by persons at least 16 years of age (No.).
  • 8703.21.01.30 Other (under: Three or four wheel off-road vehicles with straddle seat and handlebar control) (No.).
  • 8703.21.01.50 Other (under: Of a cylinder capacity not exceeding 1,000 cc) (No.).
  • 8703.22.01 Of a cylinder capacity exceeding 1,000 cc but not exceeding 1,500 cc: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 10%.
  • 8703.22.01.10 New (under: Of a cylinder capacity exceeding 1,000 cc but not exceeding 1,500 cc) (No.).
  • 8703.22.01.90 Used (under: Of a cylinder capacity exceeding 1,000 cc but not exceeding 1,500 cc) (No.).
  • 8703.23.01 Of a cylinder capacity exceeding 1,500 cc but not exceeding 3,000 cc: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM, P,PA,PE,S,SG); Column 2 10%.
  • 8703.23.01.10 Motor homes (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 3,000 cc) (No.).
  • 8703.23.01.20 Station wagons under 160 cm in height (No.).
  • 8703.23.01.30 Other (under: Station wagons and passenger vans) (No.).
  • 8703.23.01.40 Other (under: Having engines with not more than 4 cylinders) (No.).
  • 8703.23.01.60 Having engines with more than 4 cylinders but not more than 6 cylinders (No.).
  • 8703.23.01.70 Having engines with more than 6 cylinders (No.).
  • 8703.23.01.90 Used (under: Other) (No.).
  • 8703.24.01 Of a cylinder capacity exceeding 3,000 cc: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.24.01.10 Ambulances, hearses and prison vans (No.).
  • 8703.24.01.30 Motor homes (under: Of a cylinder capacity exceeding 3,000 cc) (No.).
  • 8703.24.01.40 Having engines with not more than 4 cylinders (No.).
  • 8703.24.01.50 Having engines with more than 4 cylinders but not more than 6 cylinders (No.).
  • 8703.24.01.60 Having engines with more than 6 cylinders (No.).
  • 8703.24.01.90 Used (under: Other) (No.).
  • 8703.31.01.00 Of a cylinder capacity not exceeding 1,500 cc (No.): General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.32.01 Of a cylinder capacity exceeding 1,500 cc but not exceeding 2,500 cc: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.32.01.10 New (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 2,500 cc) (No.).
  • 8703.32.01.50 Used (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 2,500 cc) (No.).
  • 8703.33.01 Of a cylinder capacity exceeding 2,500 cc: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.33.01.10 Ambulances, hearses, and prison vans (No.).
  • 8703.33.01.30 Motor homes (under: Of a cylinder capacity exceeding 2,500 cc) (No.).
  • 8703.33.01.45 New (under: Other) (No.).
  • 8703.33.01.85 Used (under: Other) (No.).
  • 8703.40.00 Other vehicles, with both spark-ignition internal combustion piston engine and electric motor as motors for propulsion, other than those capable of being charged by plugging to external source of electric power: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.40.00.05 Of a cylinder capacity not exceeding 1,000 cc (No.).
  • 8703.40.00.10 Of a cylinder capacity exceeding 1,000 cc but not exceeding 1.500 cc (No.).
  • 8703.40.00.15 Motor homes (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 3,000 cc) (No.).
  • 8703.40.00.20 Having engines with not more than 4 cylinders (No.).
  • 8703.40.00.30 Having engines with more than 4 cylinders but not more than 6 cylinders (No.).
  • 8703.40.00.40 Having engines with more than 6 cylinders (No.).
  • 8703.40.00.45 Used (under: Other) (No.).
  • 8703.40.00.50 Ambulances, hearses and prison vans (No.).
  • 8703.40.00.55 Motor homes (under: Of a cylinder capacity exceeding 3,000 cc) (No.).
  • 8703.40.00.60 Having engines with not more than 4 cylinders (No.).
  • 8703.40.00.70 Having engines with more than 4 cylinders but not more than 6 cylinders (No.).
  • 8703.40.00.80 Having engines with more than 6 cylinders (No.).
  • 8703.40.00.90 Used (under: Other) (No.).
  • 8703.50.00 Other vehicles, with both compression-ignition internal combustion piston engine and electric motor as motors for propulsion, other than those capable of being charged by plugging to external source of electric power: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.50.00.10 Of a cylinder capacity not exceeding 1,500 cc (No.).
  • 8703.50.00.30 New (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 2,500 cc) (No.).
  • 8703.50.00.50 Used (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 2,500 cc) (No.).
  • 8703.50.00.60 Ambulances, hearses and prison vans (No.).
  • 8703.50.00.65 Motor homes (under: Of a cylinder capacity exceeding 2,500 cc) (No.).
  • 8703.50.00.70 New (under: Other) (No.).
  • 8703.50.00.90 Used (under: Other) (No.).
  • 8703.60.00 Other vehicles, with both spark-ignition internal combustion piston engine and electric motor as motors for propulsion, capable of being charged by plugging to external source of electric power: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.60.00.05 Of a cylinder capacity not exceeding 1,000 cc (No.).
  • 8703.60.00.10 Of a cylinder capacity exceeding 1,000 cc but not exceeding 1,500 cc (No.).
  • 8703.60.00.15 Motor homes (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 3,000 cc) (No.).
  • 8703.60.00.20 Having engines with not more than 4 cylinders (No.).
  • 8703.60.00.30 Having engines with more than 4 cylinders but not more than 6 cylinders (No.).
  • 8703.60.00.40 Having engines with more than 6 cylinders (No.).
  • 8703.60.00.45 Used (under: Other) (No.).
  • 8703.60.00.50 Ambulances, hearses and prison vans (No.).
  • 8703.60.00.55 Motor homes (under: Of a cylinder capacity exceeding 3,000 cc) (No.).
  • 8703.60.00.60 Having engines with not more than 4 cylinders (No.).
  • 8703.60.00.70 Having engines with more than 4 cylinders but not more than 6 cylinders (No.).
  • 8703.60.00.80 Having engines with more than 6 cylinders (No.).
  • 8703.60.00.90 Used (under: Other) (No.).
  • 8703.70.00 Other vehicles, with both compression-ignition internal combustion piston engine (diesel or semi-diesel) and electric motor as motors for propulsion, capable of being charged by plugging to external source of electric power: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.70.00.10 Of a cylinder capacity not exceeding 1,500 cc (No.).
  • 8703.70.00.30 New (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 2,500 cc) (No.).
  • 8703.70.00.50 Used (under: Of a cylinder capacity exceeding 1,500 cc but not exceeding 2,500 cc) (No.).
  • 8703.70.00.60 Ambulances, hearses and prison vans (No.).
  • 8703.70.00.65 Motor homes (under: Of a cylinder capacity exceeding 2,500 cc) (No.).
  • 8703.70.00.70 New (under: Other) (No.).
  • 8703.70.00.90 Used (under: Other) (No.).
  • 8703.80.00 Other vehicles, with only electric motors for propulsion: General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8703.80.00.20 New (under: With an EPA-rated range not exceeding 250 miles) (No.).
  • 8703.80.00.45 Used (under: With an EPA-rated range not exceeding 250 miles) (No.).
  • 8703.80.00.60 New (under: With an EPA-rated range exceeding 250 miles) (No.).
  • 8703.80.00.80 Used (under: With an EPA-rated range exceeding 250 miles) (No.).
  • 8703.90.01.00 Other (under: Motor cars and other motor vehicles principally designed for the transport of persons (other than those of heading 8702), including station wagons and racing cars) (No.): General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.