HTS Heading 8704
Motor vehicles for the transport of goods
All 38 HTS codes under heading 8704 (motor vehicles for the transport of goods), with their duty rates from the 2026 HTS Revision 23. General duty Free to 25%.
Every line of heading 8704
- 8704 Motor vehicles for the transport of goods.
- 8704.10 Dumpers designed for off-highway use.
- 8704.10.10.00 Cab chassis (under: Dumpers designed for off-highway use) (No.): General Free; Special none; Column 2 25%.
- 8704.10.50 Other (under: Dumpers designed for off-highway use): General Free; Special none; Column 2 25%.
- 8704.10.50.20 With a capacity of 40.8 metric tons or less (No.).
- 8704.10.50.30 With a capacity exceeding 40.8 metric tons but not exceeding 63.5 metric tons (No.).
- 8704.10.50.40 With a capacity exceeding 63.5 metric tons but not exceeding 90.7 metric tons (No.).
- 8704.10.50.50 With a capacity exceeding 90.7 metric tons (No.).
- 8704.10.50.60 Other (under: Other) (No.).
- 8704.21.01.00 G.V.W. not exceeding 5 metric tons (No.): General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.22 G.V.W. exceeding 5 metric tons but not exceeding 20 metric tons.
- 8704.22.11 Cab chassis (under: G.V.W. exceeding 5 metric tons but not exceeding 20 metric tons): General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 8704.22.11.20 G.V.W. exceeding 5 metric tons but not exceeding 9 metric tons (No.).
- 8704.22.11.40 G.V.W. exceeding 9 metric tons but not exceeding 12 metric tons (No.).
- 8704.22.11.60 G.V.W. exceeding 12 metric tons but not exceeding 15 metric tons (No.).
- 8704.22.11.80 G.V.W. exceeding 15 metric tons but not exceeding 20 metric tons (No.).
- 8704.22.51 Other (under: G.V.W. exceeding 5 metric tons but not exceeding 20 metric tons): General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.22.51.20 G.V.W. exceeding 5 metric tons but not exceeding 9 metric tons (No.).
- 8704.22.51.40 G.V.W. exceeding 9 metric tons but not exceeding 12 metric tons (No.).
- 8704.22.51.60 G.V.W. exceeding 12 metric tons but not exceeding 15 metric tons (No.).
- 8704.22.51.80 G.V.W. exceeding 15 metric tons but not exceeding 20 metric tons (No.).
- 8704.23.01.00 G.V.W. exceeding 20 metric tons (No.): General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.31.01 G.V.W. not exceeding 5 metric tons: General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.31.01.20 G.V.W. not exceeding 2.5 metric tons (No.).
- 8704.31.01.40 G.V.W. exceeding 2.5 metric tons but not exceeding 5 metric tons (No.).
- 8704.32.01 G.V.W. exceeding 5 metric tons: General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.32.01.10 G.V.W. exceeding 5 metric tons but not exceeding 9 metric tons (No.).
- 8704.32.01.20 G.V.W. exceeding 9 metric tons but not exceeding 12 metric tons (No.).
- 8704.32.01.30 G.V.W. exceeding 12 metric tons but not exceeding 15 metric tons (No.).
- 8704.32.01.40 G.V.W. exceeding 15 metric tons but not exceeding 20 metric tons (No.).
- 8704.32.01.50 G.V.W. exceeding 20 metric tons (No.).
- 8704.41.00.00 G.V.W. not exceeding 5 metric tons (No.): General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.42.00 G.V.W. exceeding 5 metric tons but not exceeding 20 metric tons: General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.42.00.20 G.V.W. exceeding 5 metric tons but not exceeding 9 metric tons (No.).
- 8704.42.00.40 G.V.W. exceeding 9 metric tons but not exceeding 12 metric tons (No.).
- 8704.42.00.60 G.V.W. exceeding 12 metric tons but not exceeding 15 metric tons (No.).
- 8704.42.00.80 G.V.W. exceeding 15 metric tons but not exceeding 20 metric tons (No.).
- 8704.43.00.00 G.V.W. exceeding 20 metric tons (No.): General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.51.00 G.V.W. not exceeding 5 metric tons: General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.51.00.20 G.V.W. not exceeding 2.5 metric tons (No.).
- 8704.51.00.40 G.V.W. exceeding 2.5 metric tons but not exceeding 5 metric tons (No.).
- 8704.52.00 G.V.W. exceeding 5 metric tons: General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.52.00.10 G.V.W. exceeding 5 metric tons but not exceeding 9 metric tons (No.).
- 8704.52.00.20 G.V.W. exceeding 9 metric tons but not exceeding 12 metric tons (No.).
- 8704.52.00.30 G.V.W. exceeding 12 metric tons but not exceeding 15 metric tons (No.).
- 8704.52.00.40 G.V.W. exceeding 15 metric tons but not exceeding 20 metric tons (No.).
- 8704.52.00.50 G.V.W. exceeding 20 metric tons (No.).
- 8704.60.00.00 Other, with only electric motor for propulsion (No.): General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
- 8704.90.01.00 Other (under: Motor vehicles for the transport of goods) (No.): General 25%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,MA,OM,P,PA,PE,S,SG)25% (KR); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.