HTS Heading 8705

Special purpose motor vehicles, other than those principally designed for the transport of persons or goods (for example, wreckers, mobile cranes, fire fighting vehicles, concrete mixers, road sweepers, spraying vehicles, mobile workshops, mobile radiological units)

All 8 HTS codes under heading 8705 (special purpose motor vehicles), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8705

  • 8705 Special purpose motor vehicles, other than those principally designed for the transport of persons or goods (for example, wreckers, mobile cranes, fire fighting vehicles, concrete mixers, road sweepers, spraying vehicles, mobile workshops, mobile radiological units).
  • 8705.10.00 Mobile cranes (under: Special purpose motor vehicles, other than those principally designed for the transport of persons or goods (for example, wreckers, mobile cranes, fire fighting vehicles, concrete mixers, road sweepers, spraying vehicles, mobile workshops, mobile radiological units)): General Free; Special none; Column 2 25%.
  • 8705.10.00.10 Cable operated (under: Mobile cranes) (No.).
  • 8705.10.00.50 Other (under: Mobile cranes) (No.).
  • 8705.20.00.00 Mobile drilling derricks (under: Special purpose motor vehicles, other than those principally designed for the transport of persons or goods (for example, wreckers, mobile cranes, fire fighting vehicles, concrete mixers, road sweepers, spraying vehicles, mobile workshops, mobile radiological units)) (No.): General Free; Special none; Column 2 25%.
  • 8705.30.00.00 Fire fighting vehicles (under: Special purpose motor vehicles, other than those principally designed for the transport of persons or goods (for example, wreckers, mobile cranes, fire fighting vehicles, concrete mixers, road sweepers, spraying vehicles, mobile workshops, mobile radiological units)) (No.): General Free; Special none; Column 2 25%.
  • 8705.40.00.00 Concrete mixers (under: Special purpose motor vehicles, other than those principally designed for the transport of persons or goods (for example, wreckers, mobile cranes, fire fighting vehicles, concrete mixers, road sweepers, spraying vehicles, mobile workshops, mobile radiological units)) (No.): General Free; Special none; Column 2 25%.
  • 8705.90.00 Other (under: Special purpose motor vehicles, other than those principally designed for the transport of persons or goods (for example, wreckers, mobile cranes, fire fighting vehicles, concrete mixers, road sweepers, spraying vehicles, mobile workshops, mobile radiological units)): General Free; Special none; Column 2 25%.
  • 8705.90.00.10 Mobile radiological units (under: Other) (No.).
  • 8705.90.00.20 Mobile medical clinics (under: Other) (No.).
  • 8705.90.00.80 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.