HTS Heading 8706

Chassis fitted with engines, for the motor vehicles of headings 8701 to 8705

All 9 HTS codes under heading 8706 (chassis fitted with engines), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%.

Every line of heading 8706

  • 8706.00 Chassis fitted with engines, for the motor vehicles of headings 8701 to 8705.
  • 8706.00.03.00 For vehicles of subheading 8704.21 or 8704.31 (No.): General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8706.00.05 Other (under: For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702 or 8704): General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8706.00.05.20 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 (No.).
  • 8706.00.05.40 For vehicles of heading 8702 (under: Other) (No.).
  • 8706.00.05.75 For vehicles of heading 8704 (under: Other) (No.).
  • 8706.00.15 For vehicles of heading 8703 (under: Chassis fitted with engines, for the motor vehicles of headings 8701 to 8705): General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 10%.
  • 8706.00.15.20 For passenger automobiles (under: For vehicles of heading 8703) (No.).
  • 8706.00.15.40 For other vehicles of heading 8703 (No.).
  • 8706.00.25.00 For vehicles of heading 8705 (under: Chassis fitted with engines, for the motor vehicles of headings 8701 to 8705) (No.): General 1.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 10%.
  • 8706.00.30.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
  • 8706.00.50.00 Other (under: For other vehicles) (No.): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.