HTS Heading 8707

Bodies (including cabs), for the motor vehicles of headings 8701 to 8705

All 9 HTS codes under heading 8707 (bodies (including cabs)), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%.

Every line of heading 8707

  • 8707 Bodies (including cabs), for the motor vehicles of headings 8701 to 8705.
  • 8707.10.00 For vehicles of heading 8703 (under: Bodies (including cabs), for the motor vehicles of headings 8701 to 8705): General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 10%.
  • 8707.10.00.20 For passenger automobiles (under: For vehicles of heading 8703) (No.).
  • 8707.10.00.30 For vehicles having offset steering and a floorboard width of at least 114.3 cm but not more than 139.7 cm, as described in statistical note 2 to this chapter (No.).
  • 8707.10.00.90 Other (under: For other vehicles) (No.).
  • 8707.90 Other (under: Bodies (including cabs), for the motor vehicles of headings 8701 to 8705).
  • 8707.90.10.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
  • 8707.90.50 Other (under: Other): General 4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
  • 8707.90.50.20 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 (No.).
  • 8707.90.50.40 For vehicles of heading 8702 (under: Other) (No.).
  • 8707.90.50.60 For vehicles of heading 8704 (under: Other) (No.).
  • 8707.90.50.80 For vehicles of heading 8705 (under: Other) (No.).
  • 8707.90.50.90 For other vehicles (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.