HTS Heading 8708
Parts and accessories of the motor vehicles of headings 8701 to 8705
All 121 HTS codes under heading 8708 (parts and accessories), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%.
Every line of heading 8708
- 8708 Parts and accessories of the motor vehicles of headings 8701 to 8705.
- 8708.10 Bumpers and parts thereof (under: Parts and accessories of the motor vehicles of headings 8701 to 8705).
- 8708.10.30 Bumpers (under: Bumpers and parts thereof): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.10.30.20 Of steel (under: Stampings) (No.).
- 8708.10.30.30 Of aluminum (under: Stampings) (No.).
- 8708.10.30.40 Other (under: Stampings) (No.).
- 8708.10.30.50 Other (under: Bumpers) (No.).
- 8708.10.60 Parts of bumpers (under: Bumpers and parts thereof): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.10.60.10 Stampings (under: Parts of bumpers) (No.).
- 8708.10.60.50 Other (under: Parts of bumpers) (No.).
- 8708.21.00.00 Safety seat belts (under: Other parts and accessories of bodies (including cabs)) (kg): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.22.00.00 Front windscreens (windshields), rear windows and other windows specified in subheading note 1 to this chapter (No., m2): General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.29 Other (under: Other parts and accessories of bodies (including cabs)).
- 8708.29.15.00 Door assemblies (under: Other) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.29.21 For tractors suitable for agricultural use: General Free; Special none; Column 2 Free.
- 8708.29.21.20 Of steel (under: For tractors suitable for agricultural use) (No.).
- 8708.29.21.30 Of aluminum (under: For tractors suitable for agricultural use) (No.).
- 8708.29.21.40 Other (under: For tractors suitable for agricultural use) (No.).
- 8708.29.25.00 Other (under: Body stampings) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.29.51 Other (under: Other): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.29.51.10 Stampings (under: Other) (No.).
- 8708.29.51.25 Truck caps (under: Other) (No.).
- 8708.29.51.50 Tonneau covers (under: Other) (No.).
- 8708.29.51.90 Other (under: Other) (No.).
- 8708.30 Brakes and servo-brakes; parts thereof.
- 8708.30.10 For tractors suitable for agricultural use: General Free; Special none; Column 2 Free.
- 8708.30.10.10 Mounted brake linings (under: For tractors suitable for agricultural use) (No.).
- 8708.30.10.90 Other (under: For tractors suitable for agricultural use) (No.).
- 8708.30.50 For other vehicles (under: Brakes and servo-brakes; parts thereof): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.30.50.20 Brake drums (under: For other vehicles) (No.).
- 8708.30.50.30 Brake rotors (discs) (under: For other vehicles) (No.).
- 8708.30.50.40 Mounted brake linings (under: For other vehicles) (No.).
- 8708.30.50.90 Other (under: For other vehicles) (No.).
- 8708.40 Gear boxes and parts thereof (under: Parts and accessories of the motor vehicles of headings 8701 to 8705).
- 8708.40.11 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703 or 8704: General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.40.11.10 For vehicles of heading 8703 (under: For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703 or 8704) (No.).
- 8708.40.11.50 Other (under: For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703 or 8704) (No.).
- 8708.40.30.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.40.50.00 For other vehicles (under: Gear boxes) (No.): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.40.60.00 Of tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.40.65.00 Of other tractors (except road tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.40.70.00 Of cast iron (under: Other) (kg): General Free; Special none; Column 2 Free.
- 8708.40.75 Other (under: Other): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.40.75.70 Steel forgings (under: Other) (kg).
- 8708.40.75.80 Other (under: Other) (No.).
- 8708.50 Drive-axles with differential, whether or not provided with other transmission components, and non-driving axles; parts thereof.
- 8708.50.11 For tractors suitable for agricultural use: General Free; Special none; Column 2 Free.
- 8708.50.11.10 Drive axles with differential, whether or not provided with other transmission components (No., kg).
- 8708.50.11.50 Non-driving axles (under: For tractors suitable for agricultural use) (No.).
- 8708.50.31 For other tractors (under: For tractors (except road tractors)): General Free; Special none; Column 2 27.5%.
- 8708.50.31.10 Drive axles with differential, whether or not provided with other transmission components (No., kg).
- 8708.50.31.50 Non-driving axles (under: For other tractors) (No.).
- 8708.50.51 For vehicles of heading 8703 (under: Drive-axles with differential, whether or not provided with other transmission components, and non-driving axles): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.51.10 Drive axles with differential, whether or not provided with other transmission components (No., kg).
- 8708.50.51.50 Non-driving axles (under: For vehicles of heading 8703) (No.).
- 8708.50.61.00 Drive axles with differential, whether or not provided with other transmission components (No., kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.65.00 Non-driving axles (under: For other vehicles) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.70.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.50.75.00 For other tractors (under: For tractors (except road tractors)) (No.): General Free; Special none; Column 2 27.5%.
- 8708.50.79.00 Parts of non-driving axles (under: For vehicles of heading 8703) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.81.00 Of cast iron (under: Other) (kg): General Free; Special none; Column 2 Free.
- 8708.50.85.00 Half-shafts (under: Other) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.89.00 Other (under: Other) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.91 Parts of non-driving axles (under: For other vehicles): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.91.10 Spindles (under: Parts of non-driving axles) (No., kg).
- 8708.50.91.50 Other (under: Parts of non-driving axles) (No.).
- 8708.50.93.00 Of cast iron (under: Other) (kg): General Free; Special none; Column 2 Free.
- 8708.50.95.00 Half-shafts (under: Other) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.50.99.00 Other (under: Other) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.70 Road wheels and parts and accessories thereof.
- 8708.70.05.00 Road wheels (under: For tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.70.15.00 Parts and accessories (under: For tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.70.25.00 Road wheels (under: For other tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.70.35.00 Parts and accessories (under: For other tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.70.45 Road wheels (under: For other vehicles): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.70.45.30 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8704 or 8705 (No.).
- 8708.70.45.46 Wheels having a diameter of at least 57 cm but not more than 63 cm (No.).
- 8708.70.45.48 Other (under: Of aluminum) (No.).
- 8708.70.45.60 Other (under: Other) (No.).
- 8708.70.60 Parts and accessories (under: For other vehicles): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.70.60.30 Wheel rims for vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703, 8704, or 8705 (No.).
- 8708.70.60.45 Wheel covers and hubcaps for vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703, 8704 or 8705 (No.).
- 8708.70.60.60 Other (under: Parts and accessories) (No.).
- 8708.80 Suspension systems and parts thereof (including shock absorbers).
- 8708.80.03.00 McPherson struts (under: For tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.80.05.00 Other (under: For tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.80.13.00 McPherson struts (under: For other vehicles) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.80.16 Other (under: For other vehicles): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.80.16.10 Suspension assemblies having a width of at least 94.0 cm but not more than 119.4 cm, with a wheel travel not more than 12.7 cm (No.).
- 8708.80.16.90 Other (under: Other) (No.).
- 8708.80.51.00 Of tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.80.55.00 Of other tractors (except road tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.80.60.00 Of cast iron (under: Other) (kg): General Free; Special none; Column 2 Free.
- 8708.80.65 Other (under: Other): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.80.65.10 Beam hanger brackets (under: Other) (No.).
- 8708.80.65.90 Other (under: Other) (No.).
- 8708.91 Radiators and parts thereof (under: Other parts and accessories).
- 8708.91.10.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.91.50.00 For other vehicles (under: Radiators) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.91.60.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.91.65.00 For other tractors (except road tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.91.70.00 Of cast iron (under: For other vehicles) (kg): General Free; Special none; Column 2 Free.
- 8708.91.75 Other (under: For other vehicles): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.91.75.10 Radiator cores (under: Other) (No.).
- 8708.91.75.50 Other (under: Other) (No.).
- 8708.92 Mufflers and exhaust pipes; parts thereof.
- 8708.92.10.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.92.50.00 For other vehicles (under: Mufflers and exhaust pipes) (No.): General 2.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.92.60.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.92.65.00 For other tractors (except road tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.92.70.00 Of cast iron (under: For other vehicles) (kg): General Free; Special none; Column 2 Free.
- 8708.92.75.00 Other (under: For other vehicles) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.93 Clutches and parts thereof (under: Other parts and accessories).
- 8708.93.15.00 Clutches (under: For tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.93.30.00 Other (under: For tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.93.60.00 Clutches (under: For other vehicles) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.93.75.00 Other (under: For other vehicles) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.94 Steering wheels, steering columns and steering boxes; parts thereof.
- 8708.94.10.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.94.50.00 For other vehicles (under: Steering wheels, steering columns and steering boxes) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.94.60.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.94.65.00 For other tractors (except road tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.94.70.00 Of cast iron (under: For other vehicles) (kg): General Free; Special none; Column 2 Free.
- 8708.94.75 Other (under: For other vehicles): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.94.75.10 Steering shaft assemblies incorporating universal joints (No., kg).
- 8708.94.75.50 Other (under: Other) (No.).
- 8708.95 Safety airbags with inflater system; parts thereof.
- 8708.95.05.00 Inflaters and modules for airbags (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.95.10.00 For tractors suitable for agricultural use (No.): General Free; Special none; Column 2 Free.
- 8708.95.15.00 For other tractors (except road tractors) (No.): General Free; Special none; Column 2 27.5%.
- 8708.95.20.00 For other vehicles (under: Other) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.99 Other (under: Other parts and accessories).
- 8708.99.03.00 Vibration control goods containing rubber (No.): General Free; Special none; Column 2 Free.
- 8708.99.06.00 Double flanged wheel hub units incorporating ball bearings (No.): General Free; Special none; Column 2 Free.
- 8708.99.16.00 Other parts for power trains (under: Parts of tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.99.23.00 Other (under: Parts of tractors suitable for agricultural use) (No.): General Free; Special none; Column 2 Free.
- 8708.99.27.00 Vibration control goods containing rubber (No.): General Free; Special none; Column 2 27.5%.
- 8708.99.31.00 Double flanged wheel hub units incorporating ball bearings (No.): General Free; Special none; Column 2 27.5%.
- 8708.99.41.00 Other parts for power trains (under: Parts of other tractors (except road tractors)) (No.): General Free; Special none; Column 2 27.5%.
- 8708.99.48 Other (under: Parts of other tractors (except road tractors)): General Free; Special none; Column 2 27.5%.
- 8708.99.48.10 Tracklinks for track-laying tractors (No., kg).
- 8708.99.48.50 Other (under: Other) (No.).
- 8708.99.53.00 Of cast-iron (under: Other) (kg): General Free; Special none; Column 2 Free.
- 8708.99.55.00 Vibration control goods containing rubber (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.99.58.00 Double flanged wheel hub units incorporating ball bearings (No., kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.99.68 Other parts for power trains (under: Other): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.99.68.05 Drive shafts (under: Other parts for power trains) (No.).
- 8708.99.68.10 Forged universal joints for vehicles of heading 8703 (No.).
- 8708.99.68.20 Forged universal joints for vehicles of heading 8704 (No.).
- 8708.99.68.90 Other (under: Other parts for power trains) (No.).
- 8708.99.81 Other (under: Other): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8708.99.81.05 Brake hoses of plastics, with attached fittings (No.).
- 8708.99.81.15 Double flanged wheel hub units not incorporating ball bearings (No., kg).
- 8708.99.81.30 Slide-in campers (under: Other) (No.).
- 8708.99.81.60 Cable traction devices (under: Other) (kg).
- 8708.99.81.80 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.