HTS Heading 8709

Works trucks, self-propelled, not fitted with lifting or handling equipment, of the type used in factories, warehouses, dock areas or airports for short distance transport of goods; tractors of the type used on railway station platforms; parts of the foregoing vehicles

All 7 HTS codes under heading 8709 (works trucks, self-propelled), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8709

  • 8709 Works trucks, self-propelled, not fitted with lifting or handling equipment, of the type used in factories, warehouses, dock areas or airports for short distance transport of goods; tractors of the type used on railway station platforms; parts of the foregoing vehicles.
  • 8709.11.00 Electrical (under: Vehicles): General Free; Special none; Column 2 35%.
  • 8709.11.00.30 Operator riding (under: Electrical) (No.).
  • 8709.11.00.60 Other (under: Electrical) (No.).
  • 8709.19.00 Other (under: Vehicles): General Free; Special none; Column 2 35%.
  • 8709.19.00.30 Operator riding (under: Other) (No.).
  • 8709.19.00.60 Other (under: Other) (No.).
  • 8709.90.00 Parts (under: Works trucks, self-propelled, not fitted with lifting or handling equipment, of the type used in factories, warehouses, dock areas or airports for short distance transport of goods; tractors of the type used on railway station platforms; parts of the foregoing vehicles): General Free; Special none; Column 2 35%.
  • 8709.90.00.10 Road wheels (under: Parts) (kg).
  • 8709.90.00.20 Wheel and tire assemblies (under: Parts) (kg).
  • 8709.90.00.90 Other (under: Parts) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.