HTS Heading 8710

Tanks and other armored fighting vehicles, motorized, whether or not fitted with weapons, and parts of such vehicles

All 3 HTS codes under heading 8710 (tanks and other armored fighting), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8710

  • 8710.00.00 Tanks and other armored fighting vehicles, motorized, whether or not fitted with weapons, and parts of such vehicles: General Free; Special none; Column 2 35%.
  • 8710.00.00.30 Tracked (including half-tracked) (No.).
  • 8710.00.00.60 Other (under: Vehicles) (No.).
  • 8710.00.00.90 Parts (under: Tanks and other armored fighting vehicles, motorized, whether or not fitted with weapons, and parts of such vehicles) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.