HTS Heading 8711

Motorcycles (including mopeds) and cycles fitted with an auxiliary motor, with or without side-cars; side-cars

All 15 HTS codes under heading 8711 (motorcycles (including mopeds)), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.4%.

Every line of heading 8711

  • 8711 Motorcycles (including mopeds) and cycles fitted with an auxiliary motor, with or without side-cars; side-cars.
  • 8711.10.00.00 With internal combustion piston engine of a cylinder capacity not exceeding 50 cc (No.): General Free; Special none; Column 2 10%.
  • 8711.20.00 With internal combustion piston engine of a cylinder capacity exceeding 50 cc but not exceeding 250 cc: General Free; Special none; Column 2 10%.
  • 8711.20.00.30 Exceeding 50 cc but not exceeding 90 cc (No.).
  • 8711.20.00.60 Exceeding 90 cc but not exceeding 190 cc (No.).
  • 8711.20.00.90 Exceeding 190 cc but not exceeding 250 cc (No.).
  • 8711.30.00 With internal combustion piston engine of a cylinder capacity exceeding 250 cc but not exceeding 500 cc: General Free; Special none; Column 2 10%.
  • 8711.30.00.30 Exceeding 250 cc but not exceeding 290 cc (No.).
  • 8711.30.00.60 Exceeding 290 cc but not exceeding 490 cc (No.).
  • 8711.30.00.90 Exceeding 490 cc but not exceeding 500 cc (No.).
  • 8711.40 With internal combustion piston engine of a cylinder capacity exceeding 500 cc but not exceeding 800 cc.
  • 8711.40.30.00 Exceeding 500 cc but not exceeding 700 cc (No.): General Free; Special none; Column 2 10%.
  • 8711.40.60 Exceeding 700 cc but not exceeding 800 cc: General 2.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8711.40.60.30 Exceeding 700 cc but not exceeding 790 cc (No.).
  • 8711.40.60.60 Exceeding 790 cc but not exceeding 800 cc (No.).
  • 8711.50.00 With internal combustion piston engine of a cylinder capacity exceeding 800 cc: General 2.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 8711.50.00.30 Exceeding 800 cc but not exceeding 970 cc (No.).
  • 8711.50.00.60 Exceeding 970 cc (under: With internal combustion piston engine of a cylinder capacity exceeding 800 cc) (No.).
  • 8711.60.00 With electric motor for propulsion: General Free; Special none; Column 2 10%.
  • 8711.60.00.50 Of an output not exceeding 250 W (No.).
  • 8711.60.00.90 Other (under: With electric motor for propulsion) (No.).
  • 8711.90.01.00 Other (under: Motorcycles (including mopeds) and cycles fitted with an auxiliary motor, with or without side-cars; side-cars) (No.): General Free; Special none; Column 2 10%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.