HTS Heading 8712

Bicycles and other cycles (including delivery tricycles), not motorized

All 8 HTS codes under heading 8712 (bicycles and other cycles), with their duty rates from the 2026 HTS Revision 23. General duty 3.7% to 11%.

Every line of heading 8712

  • 8712.00 Bicycles and other cycles (including delivery tricycles), not motorized.
  • 8712.00.15 Bicycles having both wheels not exceeding 63.5 cm in diameter: General 11%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5.5% (JP); Column 2 30%.
  • 8712.00.15.10 Having both wheels not exceeding 50 cm in diameter (No.).
  • 8712.00.15.20 Having both wheels exceeding 50 cm but not exceeding 55 cm in diameter (No.).
  • 8712.00.15.50 Having both wheels exceeding 55 cm but not exceeding 63.5 cm in diameter (No.).
  • 8712.00.25.00 If weighing less than 16.3 kg complete without accessories and not designed for use with tires having a cross-sectional diameter exceeding 4.13 cm (No.): General 5.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG)2.75% (JP); Column 2 30%.
  • 8712.00.35.00 Other (under: Bicycles having both wheels exceeding 63.5 cm in diameter) (No.): General 11%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5.5% (JP); Column 2 30%.
  • 8712.00.44.00 Bicycles having a front wheel exceeding 55 cm but not exceeding 63.5 cm in diameter and a rear wheel exceeding 63.5 cm in diameter, weighing less than 16.3 kg complete without accessories and not designed for use with tires having a cross-sectional diameter exceeding 4.13 cm, valued $200 or more each (No.): General 5.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG)2.75% (JP); Column 2 30%.
  • 8712.00.48.00 Other bicycles (under: Bicycles and other cycles (including delivery tricycles), not motorized) (No.): General 11%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 5.5% (JP); Column 2 30%.
  • 8712.00.50.00 Other cycles (under: Bicycles and other cycles (including delivery tricycles), not motorized) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.