HTS Heading 9403
Other furniture and parts thereof
All 86 HTS codes under heading 9403 (other furniture and parts thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9403
- 9403 Other furniture and parts thereof.
- 9403.10.00 Metal furniture of a kind used in offices: General Free; Special none; Column 2 45%.
- 9403.10.00.20 Filing cabinets (under: Metal furniture of a kind used in offices) (No.).
- 9403.10.00.40 Other (under: Metal furniture of a kind used in offices) (No.).
- 9403.20.00 Other metal furniture (under: Other furniture and parts thereof): General Free; Special none; Column 2 45%.
- 9403.20.00.11 Floor-standing, metal-top ironing boards (No.).
- 9403.20.00.16 Cribs (under: Other) (No.).
- 9403.20.00.17 Toddler beds, bassinets, cradles, play yards and other enclosures for confining children (No.).
- 9403.20.00.35 Mechanically adjustable bed or mattress base, not foldable, having the characteristics of a bed or bed frame, of a width exceeding 91.44 cm, of a length exceeding 184.15 cm, and of a depth exceeding 8.89 cm (No.).
- 9403.20.00.40 Mattress bases with legs, not foldable, having the characteristics of a stationary (not mechanically adjustable) bed frame, of a width exceeding 91.44 cm, of a length exceeding 184.15 cm and of a depth exceeding 8.89 cm (No.).
- 9403.20.00.46 Mechanically adjustable (under: Foldable mattress foundations with legs, having the characteristics of a bed or bed frame, whether or not mechanically adjustable) (No.).
- 9403.20.00.48 Stationary (not mechanically adjustable) (No.).
- 9403.20.00.50 Other (under: Other) (No.).
- 9403.20.00.75 Boltless or press-fit steel shelving units prepackaged for sale as described in statistical note 4 to this chapter (No.).
- 9403.20.00.78 Storage lockers, other than exchange lockers as described in statistical note 5 to this chapter (No.).
- 9403.20.00.82 Steel racks, other than those described in statistical reporting number 9403.20.0075 (No.).
- 9403.20.00.86 Other (under: Counters, lockers, racks, display cases, shelves, partitions and similar fixtures) (No.).
- 9403.20.00.90 Other (under: Other) (No.).
- 9403.30 Wooden furniture of a kind used in offices.
- 9403.30.40.00 Bent-wood furniture (under: Wooden furniture of a kind used in offices) (No.): General Free; Special none; Column 2 42.5%.
- 9403.30.80 Other (under: Wooden furniture of a kind used in offices): General Free; Special none; Column 2 40%.
- 9403.30.80.01 Of Padauk (Padouk) or Narra (Pterocarpus spp.) (No.).
- 9403.30.80.05 Of Rosewood, Palissander, Cocobolo, Bois de Rose, Kingwood, Tulipwood or Blackwood (Dalbergia spp.) (No.).
- 9403.30.80.21 Of teak (Tectona spp.) (under: Other) (No.).
- 9403.30.80.31 Of Wenge (Millettia spp.) (under: Other) (No.).
- 9403.30.80.90 Other (under: Other) (No.).
- 9403.40 Wooden furniture of a kind used in the kitchen.
- 9403.40.40.00 Bent-wood furniture (under: Wooden furniture of a kind used in the kitchen) (No.): General Free; Special none; Column 2 42.5%.
- 9403.40.60.00 Designed for motor vehicle use (No.): General Free; Special none; Column 2 25%.
- 9403.40.90 Other (under: Other): General Free; Special none; Column 2 40%.
- 9403.40.90.40 Dining tables (under: Other) (No.).
- 9403.40.90.60 Cabinets designed for permanent installation (No.).
- 9403.40.90.80 Other (under: Other) (No.).
- 9403.50 Wooden furniture of a kind used in the bedroom.
- 9403.50.40.00 Bent-wood furniture (under: Wooden furniture of a kind used in the bedroom) (No.): General Free; Special none; Column 2 42.5%.
- 9403.50.60.00 Designed for motor vehicle use (No.): General Free; Special none; Column 2 25%.
- 9403.50.90 Other (under: Other): General Free; Special none; Column 2 40%.
- 9403.50.90.41 Cribs (under: Beds) (No.).
- 9403.50.90.42 Toddler beds, bassinets, and cradles (No.).
- 9403.50.90.45 Other (under: Beds) (No.).
- 9403.50.90.80 Other (under: Other) (No.).
- 9403.60 Other wooden furniture (under: Other furniture and parts thereof).
- 9403.60.40.00 Bent-wood furniture (under: Other wooden furniture) (No.): General Free; Special none; Column 2 42.5%.
- 9403.60.80 Other (under: Other wooden furniture): General Free; Special none; Column 2 40%.
- 9403.60.80.10 Play yards and other enclosures for confining children (No.).
- 9403.60.80.40 Dining tables (under: Other) (No.).
- 9403.60.80.89 Of teak (Tectona spp.) (under: Other) (No.).
- 9403.60.80.93 Other (under: Other) (No.).
- 9403.70 Furniture of plastics (under: Other furniture and parts thereof).
- 9403.70.40 Of reinforced or laminated plastics: General Free; Special none; Column 2 65%.
- 9403.70.40.01 Cribs (under: Of reinforced or laminated plastics) (No.).
- 9403.70.40.02 Toddler beds, bassinets and cradles (No.).
- 9403.70.40.03 Play yards and other enclosures for confining children (No.).
- 9403.70.40.15 Other household (under: Of reinforced or laminated plastics) (No.).
- 9403.70.40.20 Office (under: Of reinforced or laminated plastics) (No.).
- 9403.70.40.31 Other (under: Of reinforced or laminated plastics) (No.).
- 9403.70.80 Other (under: Furniture of plastics): General Free; Special none; Column 2 25%.
- 9403.70.80.01 Cribs (under: Other) (No.).
- 9403.70.80.02 Toddler beds, bassinets and cradles (No.).
- 9403.70.80.03 Play yards and other enclosures for confining children (No.).
- 9403.70.80.15 Other household (under: Other) (No.).
- 9403.70.80.20 Office (under: Other) (No.).
- 9403.70.80.31 Other (under: Other) (No.).
- 9403.82.00 Of bamboo (under: Furniture of other materials, including cane, osier, bamboo or similar materials): General Free; Special none; Column 2 60%.
- 9403.82.00.01 Cribs (under: Of bamboo) (No.).
- 9403.82.00.02 Toddler beds, bassinets, and cradles; play yards and other enclosures for confining children (No.).
- 9403.82.00.15 Other household (under: Of bamboo) (No.).
- 9403.82.00.30 Other (under: Of bamboo) (No.).
- 9403.83.00 Of rattan (under: Furniture of other materials, including cane, osier, bamboo or similar materials): General Free; Special none; Column 2 60%.
- 9403.83.00.01 Cribs (under: Of rattan) (No.).
- 9403.83.00.02 Toddler beds, bassinets, and cradles; play yards and other enclosures for confining children (No.).
- 9403.83.00.15 Other household (under: Of rattan) (No.).
- 9403.83.00.30 Other (under: Of rattan) (No.).
- 9403.89 Other (under: Furniture of other materials, including cane, osier, bamboo or similar materials).
- 9403.89.30 Of cane, osier or similar materials: General Free; Special none; Column 2 60%.
- 9403.89.30.10 Household (under: Of cane, osier or similar materials) (No.).
- 9403.89.30.20 Other (under: Of cane, osier or similar materials) (No.).
- 9403.89.60 Other (under: Other): General Free; Special none; Column 2 45%.
- 9403.89.60.03 Cribs, toddler beds, bassinets, and cradles; play yards and other enclosures for confining children (No.).
- 9403.89.60.15 Other household (under: Other) (No.).
- 9403.89.60.20 Other (under: Other) (No.).
- 9403.91.00 Of wood (under: Parts): General Free; Special none; Column 2 40%.
- 9403.91.00.05 For toddler beds, cribs, bassinets and cradles (No.).
- 9403.91.00.10 For play yards and other enclosures for confining children (No.).
- 9403.91.00.80 Other (under: Of wood) (No.).
- 9403.99 Other (under: Parts).
- 9403.99.10 Of furniture of a kind used for motor vehicles: General Free; Special none; Column 2 25%.
- 9403.99.10.40 Of metal (under: Of furniture of a kind used for motor vehicles) (kg).
- 9403.99.10.50 Of textile material, cut to shape (kg).
- 9403.99.10.85 Other (under: Of furniture of a kind used for motor vehicles) (kg).
- 9403.99.20 Of cane, osier, bamboo or similar materials: General Free; Special none; Column 2 60%.
- 9403.99.20.40 Of rattan (under: Of cane, osier, bamboo or similar materials) (kg).
- 9403.99.20.80 Other (under: Of cane, osier, bamboo or similar materials) (kg).
- 9403.99.30 Of reinforced or laminated plastics: General Free; Special none; Column 2 65%.
- 9403.99.30.05 For toddler beds, cribs, bassinets and cradles (No.).
- 9403.99.30.10 For play yards and other enclosures for confining children (No.).
- 9403.99.30.80 Other (under: Of reinforced or laminated plastics) (No.).
- 9403.99.40 Other (under: Of rubber or plastics): General Free; Special none; Column 2 25%.
- 9403.99.40.05 For toddler beds, cribs, bassinets and cradles (No.).
- 9403.99.40.10 For play yards and other enclosures for confining children (No.).
- 9403.99.40.80 Other (under: Other) (No.).
- 9403.99.50 Of textile material, except cotton: General Free; Special none; Column 2 80%.
- 9403.99.50.05 For toddler beds, cribs, bassinets and cradles (No.).
- 9403.99.50.10 For play yards and other enclosures for confining children (No.).
- 9403.99.50.80 Other (under: Of textile material, except cotton) (No.).
- 9403.99.90 Other (under: Other): General Free; Special none; Column 2 45%.
- 9403.99.90.10 For toddler beds, cribs, bassinets and cradles (No.).
- 9403.99.90.15 For play yards and other enclosures for confining children (No.).
- 9403.99.90.20 Welded wire rack, whether or not galvanized, plated or coated (kg).
- 9403.99.90.40 Parts for steel racks of statistical reporting number 9403.20.0082 (kg).
- 9403.99.90.45 Other (under: Of metal) (kg).
- 9403.99.90.51 Of cotton, cut to shape (under: Other) (kg).
- 9403.99.90.61 Other (under: Other) (kg, No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.