HTS Heading 9603
Brooms, brushes (including brushes constituting parts of machines, appliances or vehicles), hand-operated mechanical floor sweepers, not motorized, mops and feather dusters; prepared knots and tufts for broom or brush making; paint pads and rollers; squeegees (other than roller squeegees)
All 26 HTS codes under heading 9603 (brooms), with their duty rates from the 2026 HTS Revision 23. General duty Free to 32%, some per unit.
Every line of heading 9603
- 9603 Brooms, brushes (including brushes constituting parts of machines, appliances or vehicles), hand-operated mechanical floor sweepers, not motorized, mops and feather dusters; prepared knots and tufts for broom or brush making; paint pads and rollers; squeegees (other than roller squeegees).
- 9603.10 Brooms and brushes, consisting of twigs or other vegetable materials bound together, with or without handles.
- 9603.10.05.00 In any calendar year prior to the entry, or withdrawal from warehouse for comsumption, of 61,655 dozen whiskbrooms classifiable under subheadings 9603.10.05 to 9603.10.35, inclusive (No.): General 8%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 20%.
- 9603.10.15.00 Other (under: Valued not over 96¢ each) (No.): General 5¢ each; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 12¢ each.
- 9603.10.35.00 Valued over 96¢ each (under: Whiskbrooms, wholly or in part of broom corn) (No.): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32%.
- 9603.10.40.00 In any calendar year prior to the entry, or withdrawal from warehouse for consumption, of 121,478 dozen brooms classifiable under subheadings 9603.10.40 to 9603.10.60, inclusive (No.): General 8%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 20%.
- 9603.10.50.00 Other (under: Valued not over 96¢ each) (No.): General 32¢ each; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32¢ each.
- 9603.10.60.00 Valued over 96¢ each (under: Other brooms, wholly or in part of broom corn) (No.): General 32%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 32%.
- 9603.10.90.00 Other (under: Brooms and brushes, consisting of twigs or other vegetable materials bound together, with or without handles) (No.): General 10%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 9603.21.00.00 Toothbrushes, including dental-plate brushes (No.): General Free; Special none; Column 2 2¢ each + 50%.
- 9603.29 Other (under: Toothbrushes, shaving brushes, hair brushes, nail brushes, eyelash brushes and other toilet brushes for use on the person, including such brushes constituting parts of appliances).
- 9603.29.40 Valued not over 40¢ each (under: Other): General 0.2¢ each + 7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1¢ each + 50%.
- 9603.29.40.10 Hairbrushes (under: Valued not over 40¢ each) (No.).
- 9603.29.40.90 Other (under: Valued not over 40¢ each) (No.).
- 9603.29.80 Valued over 40¢ each (under: Other): General 0.3¢ each + 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1¢ each + 50%.
- 9603.29.80.10 Hairbrushes (under: Valued over 40¢ each) (No.).
- 9603.29.80.90 Other (under: Valued over 40¢ each) (No.).
- 9603.30 Artists' brushes, writing brushes and similar brushes for the application of cosmetics.
- 9603.30.20.00 Valued not over 5¢ each (under: Artists' brushes, writing brushes and similar brushes for the application of cosmetics) (No.): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9603.30.40.00 Valued over 5¢ but not over 10¢ each (No.): General Free; Special none; Column 2 40%.
- 9603.30.60.00 Valued over 10¢ each (under: Artists' brushes, writing brushes and similar brushes for the application of cosmetics) (No.): General Free; Special none; Column 2 40%.
- 9603.40 Paint, distemper, varnish or similar brushes (other than brushes of subheading 9603.30); paint pads and rollers.
- 9603.40.20.00 Paint rollers (under: Paint, distemper, varnish or similar brushes (other than brushes of subheading 9603.30); paint pads and rollers) (No.): General 7.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 9603.40.40 Other (under: Paint, distemper, varnish or similar brushes (other than brushes of subheading 9603.30); paint pads and rollers): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 9603.40.40.20 Paint pads (under: Other) (No.).
- 9603.40.40.40 Natural bristle brushes (under: Other) (No.).
- 9603.40.40.60 Other (under: Other) (No.).
- 9603.50.00.00 Other brushes constituting parts of machines, appliances or vehicles (No.): General Free; Special none; Column 2 35%.
- 9603.90 Other (under: Brooms, brushes (including brushes constituting parts of machines, appliances or vehicles), hand-operated mechanical floor sweepers, not motorized, mops and feather dusters; prepared knots and tufts for broom or brush making; paint pads and rollers; squeegees (other than roller squeegees)).
- 9603.90.40.00 Feather dusters (under: Other) (No.): General Free; Special none; Column 2 45%.
- 9603.90.80 Other (under: Other): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 9603.90.80.10 Whiskbrooms (under: Other) (No.).
- 9603.90.80.20 Upright brooms (under: Other) (No.).
- 9603.90.80.30 Push brooms, 41 cm or less in width (No.).
- 9603.90.80.40 Other brooms (under: Other) (No.).
- 9603.90.80.50 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.