HTS Heading 9604

Hand sieves and hand riddles

The HTS code under heading 9604 (hand sieves and hand riddles), with its duty rates from the 2026 HTS Revision 23. General duty 4.9%.

Every line of heading 9604

  • 9604.00.00.00 Hand sieves and hand riddles (No.): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.