HTS Heading 9605
Travel sets for personal toilet, sewing or shoe or clothes cleaning (other than manicure and pedicure sets of heading 8214)
The HTS code under heading 9605 (travel sets for personal toilet), with its duty rates from the 2026 HTS Revision 23. General duty 8.1%.
Every line of heading 9605
- 9605.00.00.00 Travel sets for personal toilet, sewing or shoe or clothes cleaning (other than manicure and pedicure sets of heading 8214) (No.): General 8.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.