HTS Heading 9606

Buttons, press-fasteners, snap-fasteners and press-studs, button molds and other parts of these articles; button blanks

All 11 HTS codes under heading 9606 (buttons, press-fasteners), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%.

Every line of heading 9606

  • 9606 Buttons, press-fasteners, snap-fasteners and press-studs, button molds and other parts of these articles; button blanks.
  • 9606.10 Press-fasteners, snap-fasteners and press-studs and parts thereof.
  • 9606.10.40.00 Valued not over 20¢ per dozen pieces or parts (gross): General 3.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 9606.10.80.00 Valued over 20¢ per dozen pieces or parts (gross): General 2.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 9606.21 Of plastics, not covered with textile material.
  • 9606.21.20.00 Of casein (under: Of plastics, not covered with textile material) (gross): General Free; Special none; Column 2 45%.
  • 9606.21.40.00 Of acrylic resin, of polyester resin or of both such resins (gross, gr.lines): General 0.3¢/line/ gross + 4.6%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.5¢/line/ gross + 25%.
  • 9606.21.60.00 Other (under: Of plastics, not covered with textile material) (gross): General 4.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9606.22.00.00 Of base metal, not covered with textile material (gross): General Free; Special none; Column 2 45%.
  • 9606.29 Other (under: Buttons).
  • 9606.29.20.00 Of acrylic resin, of polyester resin or of both such resins, covered with textile material (gross, gr.lines): General 0.3¢/line/ gross + 4.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.5¢/line/ gross + 25%.
  • 9606.29.40.00 Of pearl or shell (under: Other) (gross, gr.lines): General 0.18¢/line/ gross + 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 1.75¢/line/ gross + 25%.
  • 9606.29.60.00 Other (under: Other) (gross): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9606.30 Button molds and other parts of buttons; button blanks.
  • 9606.30.40.00 Button blanks of casein (under: Button molds and other parts of buttons; button blanks) (gross): General Free; Special none; Column 2 45%.
  • 9606.30.80.00 Other (under: Button molds and other parts of buttons; button blanks) (gross): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.