HTS Heading 9607
Slide fasteners and parts thereof
All 6 HTS codes under heading 9607 (slide fasteners and parts thereof), with their duty rates from the 2026 HTS Revision 23. General duty 10% to 13%.
Every line of heading 9607
- 9607 Slide fasteners and parts thereof.
- 9607.11.00.00 Fitted with chain scoops of base metal (No.): General 10%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 66%.
- 9607.19.00 Other (under: Slide fasteners): General 13%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 66%.
- 9607.19.00.20 Fitted with chain scoops of plastic (No.).
- 9607.19.00.40 Fitted with continuous plastic filament (No.).
- 9607.19.00.60 Other (under: Other) (No.).
- 9607.20.00 Parts (under: Slide fasteners and parts thereof): General 11.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 66%.
- 9607.20.00.40 Sliders, with or without pulls (thousands).
- 9607.20.00.80 Other (under: Parts) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.