HTS Heading 9614

Smoking pipes (including pipe bowls) and cigar or cigarette holders, and parts thereof

All 9 HTS codes under heading 9614 (smoking pipes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.2%, some per unit.

Every line of heading 9614

  • 9614.00 Smoking pipes (including pipe bowls) and cigar or cigarette holders, and parts thereof.
  • 9614.00.21.00 Roughly shaped blocks of wood or root, for the manufacture of pipes (gross): General Free; Special none; Column 2 10%.
  • 9614.00.25.00 Other (under: Of wood or root) (No.): General 0.4¢ each + 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5¢ each + 60%.
  • 9614.00.26.00 Pipes and bowls wholly of clay and pipes with bowls wholly of clay (No.): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 9614.00.28 Other (under: Pipes and pipe bowls): General 0.3¢ each + 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5¢ each + 60%.
  • 9614.00.28.10 Of glass (under: Other) (No.).
  • 9614.00.28.30 Of plastics (under: Other) (No.).
  • 9614.00.28.90 Other (under: Other) (No.).
  • 9614.00.94.00 Of metal (under: Other) (No.): General 7.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
  • 9614.00.98 Other (under: Other): General 0.5¢ each + 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 5¢ each + 60%.
  • 9614.00.98.10 Of glass (under: Other) (No.).
  • 9614.00.98.90 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.