HTS Heading 9615
Combs, hair-slides and the like; hairpins, curling pins, curling grips, hair-curlers and the like, other than those of heading 8516, and parts thereof
All 12 HTS codes under heading 9615 (combs), with their duty rates from the 2026 HTS Revision 23. General duty Free to 11%, some per unit.
Every line of heading 9615
- 9615 Combs, hair-slides and the like; hairpins, curling pins, curling grips, hair-curlers and the like, other than those of heading 8516, and parts thereof.
- 9615.11 Of hard rubber or plastics (under: Combs, hair-slides and the like).
- 9615.11.10.00 Valued not over $4.50 per gross (gross): General 14.4¢/gross + 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.44/gross + 25%.
- 9615.11.20.00 Of hard rubber (under: Valued over $4.50 per gross) (gross): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 36%.
- 9615.11.30.00 Other (under: Valued over $4.50 per gross) (gross): General 28.8¢/gross + 4.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $2.88/gross + 35%.
- 9615.11.40.00 Not set with imitation pearls or imitation gemstones (No.): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 9615.11.50.00 Other (under: Other) (No.): General Free; Special none; Column 2 110%.
- 9615.19 Other (under: Combs, hair-slides and the like).
- 9615.19.20.00 Valued not over $4.50 per gross (gross): General 9.7¢/gross + 1.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.44/gross + 25%.
- 9615.19.40.00 Valued over $4.50 per gross (under: Combs) (gross): General 28.8¢/gross + 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $2.88/gross + 35%.
- 9615.19.60.00 Other (under: Other) (No.): General 11%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
- 9615.90 Other (under: Combs, hair-slides and the like; hairpins, curling pins, curling grips, hair-curlers and the like, other than those of heading 8516, and parts thereof).
- 9615.90.20.00 Nonthermic, nonornamental devices for curling the hair (No.): General 8.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9615.90.30.00 Hair pins (under: Other) (kg): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9615.90.40.00 Of rubber or plastics, not set with imitation pearls or imitation gemstones (No.): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 9615.90.60.00 Other (under: Other) (No.): General 11%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.