HTS Heading 9616
Scent sprayers and similar toilet sprayers, and mounts and heads therefor; powder puffs and pads for the application of cosmetics or toilet preparations
All 2 HTS codes under heading 9616 (scent sprayers and similar toilet sprayers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.3%.
Every line of heading 9616
- 9616 Scent sprayers and similar toilet sprayers, and mounts and heads therefor; powder puffs and pads for the application of cosmetics or toilet preparations.
- 9616.10.00.00 Scent sprayers and similar toilet sprayers, and mounts and heads therefor (No.): General Free; Special none; Column 2 40%.
- 9616.20.00.00 Powder puffs and pads for the application of cosmetics or toilet preparations (kg): General 4.3%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 78.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.