Sourcing Signal
Import Burden by Source Country
Compare observed source-country duty and international-freight burdens for 57 manufacturing families.
Families covered
- Steel flat-rolled products: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Steel bar, rod, and wire: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Stainless steel mill products: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Steel pipe and tube: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Fabricated structural steel: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Steel fasteners: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Iron and steel castings and articles: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Copper semi-finished products: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Aluminum semi-finished products: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Aluminum articles: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Hand tools: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Cutting tools and inserts: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Metal-cutting machine tools: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Metal-forming machine tools: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Molds and die sets: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Pumps for liquids: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Compressors and fans: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Lifting and handling equipment: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Valves and fluid controls: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Bearings: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Gears and power transmission: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Electric motors and generators: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Transformers and power supplies: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Welding equipment: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Insulated wire and cable: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Plastics in primary forms: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Plastic semi-finished products: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Measuring and inspection instruments: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Rubber materials and products: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Abrasives and grinding wheels: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Paints, coatings, and finishes: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Adhesives and sealants: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Technical and refractory ceramics: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Glass fiber and reinforcements: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Nickel and nickel alloys: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Titanium and tungsten: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Springs, chain, and wire mesh: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Tanks, vessels, and gas cylinders: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Semiconductors and integrated circuits: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Capacitors, resistors, and circuit boards: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Switchgear, connectors, and controls: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Batteries and storage cells: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Lamps and LED lighting: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Carbon products and insulators: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Internal combustion engines: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Turbines and fluid-power drives: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Heat exchange and process heating: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Industrial furnaces and ovens: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Filtering and separation equipment: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Plastics and rubber machinery: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Robots and automated machinery: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Semiconductor and display equipment: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Gaskets and mechanical seals: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Powered hand tools: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Packaging and filling machinery: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Foundry and rolling equipment: 10 source-country lanes, duty-and-freight burdens shown unranked.
- Optical elements and lenses: 10 source-country lanes, duty-and-freight burdens shown unranked.
About this data
- A sourcing-comparison indicator, not a customs quote. Duty and international freight are added over customs value; duty is not compounded onto freight. Lanes are ranked by modeled landed customs unit value only when at least two have their own reported customs unit value, duty, and freight. Missing or suppressed quantity data remains unknown. FX is a direction, not a recompute. Confirm classification and entry costs with a licensed broker.
Cadence and source
- Monthly, refreshed automatically as USITC posts new customs data
- Duty and freight from USITC DataWeb; FX drift from Federal Reserve H.10. A sourcing indicator, not a customs quote. Per-family CSVs at /landed-cost/<family>.
Last reviewed 2026-10-08.