Market Wire
Manufacturing in Massachusetts Runs 19% Above the National Cost Average in August 2026
Massachusetts's manufacturing cost index stands at 118.5 against a national 100 as of August 2026: labor at 109.7 and industrial energy at 219.6. That places it 46th cheapest of 51 jurisdictions, the 50 states and DC. Labor uses 2025 wages; energy averages industrial electricity prices from September 2025 to August 2026.
- composite (US = 100): 118.5
- labor: 109.7
- industrial energy: 219.6
The composite weights labor at 92% and industrial electricity at 8%, so Massachusetts's position is mostly an energy story: its energy component indexes at 219.6 against the national 100. A premium of 19 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.
For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.
Published 2026-11-25.