Market Wire

Manufacturing in Washington Runs 26% Above the National Cost Average in August 2026

Washington's manufacturing cost index stands at 126.0 against a national 100 as of August 2026: labor at 130.0 and industrial energy at 80.3. That places it 48th cheapest of 51 jurisdictions, the 50 states and DC. Labor uses 2025 wages; energy averages industrial electricity prices from September 2025 to August 2026.

  • composite (US = 100): 126.0
  • labor: 130.0
  • industrial energy: 80.3

The composite weights labor at 92% and industrial electricity at 8%, so Washington's position is mostly a labor story: its labor component indexes at 130.0 against the national 100. A premium of 26 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.

For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.

Published 2026-11-25.