Forecast Signal

South Korean Won: Six-Month Forecast

1373.0071 projected by Apr 2027 (+2.7% from 1337.3605 in Oct 2026), 80% target band 1254.6047 to 1491.4095. A six-month statistical projection for south korean won, shown with its target band and one-step backtest error.

The six-month projection

  • Projected for Apr 2027: 1373.0071, +2.7% versus 1337.3605 in Oct 2026.
  • Band at the six-month horizon: 80% target band 1254.6047 to 1491.4095.
  • Direction: Within error. The +2.7% move sits inside the 80% target band, so the model cannot call its direction.
  • One-step backtest error (MAPE): 8.7% over 2 points, one step ahead on months the model had not seen.

Statistical extrapolation, not a market or policy forecast

  • It knows nothing about the next Fed decision, OPEC action, or policy change. Read the target band and the backtest error, not just the central line.
  • So far 68.2% of 1,023 stored predictions graded against later prints landed inside their 80% target band. No prediction 6 months ahead has been graded yet.
  • This series publishes daily. The model averages those daily readings into one point per calendar month and forecasts monthly, so it is anchored on October 2026, the most recent COMPLETE month. The newest daily reading, 1342.4100 on Nov 20, 2026, is not in the anchor yet: it belongs to a month that is still filling, and joins the model once that month closes.

How it is built

  • The series is collapsed to one point per month, then projected six months with Holt linear exponential smoothing with a damped trend and no seasonal pattern. The smoothing parameters are grid-searched by walk-forward validation on an early tuning segment, and the reported error is the mean absolute percentage error over the 2 one-step-ahead predictions in a final evaluation segment never used for selection or band calibration. Deterministic: the same data always yields the same forecast.
  • The 80% band is a labelled Gaussian fallback, used because the history is too short to calibrate an empirical residual band.

Source

  • Source: Federal Reserve H.10 via FRED. Underlying series is U.S. government open data, public domain.

Last reviewed 2026-11-25.