Tariff Monitor
U.S. Imports of Tanks, vessels, and gas cylinders From Austria
In 2025, U.S. importers brought in $9.8M of tanks, vessels, and gas cylinders from Austria; the reported effective calculated-duty rate was 21.77% for that flow. That makes Austria the 17th-largest named source of this family, at 0.7% of tracked tanks, vessels, and gas cylinders imports. The family-wide effective calculated-duty rate is 22.45%, so Austria's observed rate is 0.7 points less than average. Freight and insurance add 11.66% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $9.8M of tanks, vessels, and gas cylinders from Austria in 2025, customs value.
- Observed effective calculated-duty rate: 21.77%, reported Calculated Duties ÷ covered customs value, 0.7 points below the 22.45% family average.
- Share of the family: 0.7%, #17 named source of tanks, vessels, and gas cylinders.
- Reported freight and insurance: 11.66% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 3 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on tanks, vessels, and gas cylinders from Austria? In 2025, the reported effective calculated-duty rate was 21.77% for tanks, vessels, and gas cylinders imported from Austria, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much tanks, vessels, and gas cylinders does the U.S. import from Austria? The U.S. imported $9.8M of tanks, vessels, and gas cylinders from Austria in 2025, 0.7% of the tracked tanks, vessels, and gas cylinders it imports, ranking Austria the 17th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on tanks, vessels, and gas cylinders from Austria? Cost, insurance, and freight ran 11.66% of customs value on tanks, vessels, and gas cylinders from Austria in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.